User talk:DwarfLord/At-grade connectors View history

(Created page with "I think it would be useful to factor a road's posted Speed Limit into the complexity score. Also, did you mean to say 225 '''''meters''''' for the distance of an early commit...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
I think it would be useful to factor a road's posted Speed Limit into the complexity score.
I think it would be useful to factor a road's posted Speed Limit into the complexity score.


Also, did you mean to say 225 '''''meters''''' for the distance of an early commit? That seems like an awfully long distance.  
Also, did you mean to say 225 '''''meters''''' for the distance of an early commit? That seems like an awfully long distance. (Equates to a little over 14 seconds, at 35 mph).


Some specific mention of confusion with earlier turns might be good.
A condition might be mentioned for turn lanes which tend to stack up a long distance before the turn, regardless of pocket, or commit, length.  


-tonestertm
-tonestertm

Latest revision as of 23:35, 3 May 2015

I think it would be useful to factor a road's posted Speed Limit into the complexity score.

Also, did you mean to say 225 meters for the distance of an early commit? That seems like an awfully long distance. (Equates to a little over 14 seconds, at 35 mph).

A condition might be mentioned for turn lanes which tend to stack up a long distance before the turn, regardless of pocket, or commit, length.

-tonestertm