Connecticut/Closures: Difference between revisions Discussion View history

(→‎New Canaan: section removed - construction complete)
(→‎New Haven: Reopen E Rock Rd per Project page & MPs in WME)
(17 intermediate revisions by 5 users not shown)
Line 1: Line 1:
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Road closures]] before making changes to the map and this page.
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page.


<!-- These comments are very old and are likely more confusing to new editors
<!-- These comments are very old and are likely more confusing to new editors
Line 19: Line 19:
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat"| Status
! scope="col" width="100" bgcolor="wheat"| Status
|- align="center" bgcolor="lime"
| Riverwalk || Yearly<br>July 4th Wknd || Hartford<br>E Hartford || [http://patch.com/connecticut/shelton/road-closures-for-riverwalk-fireworks-july-3 Closures] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="yellow"
|- align="center" bgcolor="yellow"
| Hartford Marathon || Yearly<br>2nd Sat in Oct || Hartford<br>E/W Hartford || [http://www.hartfordmarathon.com/Events/NU_Hartford_Marathon/Road_Closures___CT_Transit.htm Closures] || 2014 - In Progress<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
| Hartford Marathon || Yearly<br>2nd Sat in Oct || Hartford<br>E/W Hartford || [http://www.hartfordmarathon.com/Events/NU_Hartford_Marathon/Road_Closures___CT_Transit.htm Closures] || 2014 - In Progress<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="white"
| First Night Hartford || Yearly<br>New Years Eve || Hartford || [http://www.firstnighthartford.org/ Event Site] || 2014 - Not Yet Submitted
|-
|}
|}


== Minor Events ==
== Minor Events ==
These are Minor Events that are submitted to via the closure sheet on a regular basis, typically yearly.
These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="100" bgcolor="wheat"| What
! scope="col" width="100" bgcolor="wheat"| What
Line 38: Line 33:
|- align="center" bgcolor="lime"
|- align="center" bgcolor="lime"
| Riverwalk || Yearly<br>July 4th Wknd || Hartford<br>E Hartford || [http://patch.com/connecticut/shelton/road-closures-for-riverwalk-fireworks-july-3 Closures] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
| Riverwalk || Yearly<br>July 4th Wknd || Hartford<br>E Hartford || [http://patch.com/connecticut/shelton/road-closures-for-riverwalk-fireworks-july-3 Closures] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="yellow"
|- align="center" bgcolor="lime"
| Hartford Marathon || Yearly<br>2nd Sat in Oct || Hartford<br>E/W Hartford || [http://www.hartfordmarathon.com/Events/NU_Hartford_Marathon/Road_Closures___CT_Transit.htm Closures] || 2014 - In Progress<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
| Manchester Road Race || Yearly<br>Thanksgiving Day || Manchester || [https://www.manchesterroadrace.com/CourseMapShell.html] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="white"
|- align="center" bgcolor="white"
| First Night Hartford || Yearly<br>New Years Eve || Hartford || [http://www.firstnighthartford.org/ Event Site] || 2014 - Not Yet Submitted
| First Night Hartford || Yearly<br>New Years Eve || Hartford || [http://www.firstnighthartford.org/ Event Site] || 2014 - Not Yet Submitted
Line 65: Line 60:
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#ffff00"
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.18873&lon=-73.16687&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9168431 '''Grant St''']<br/>b/w Central & Mill Hill || 6/28/2012<br/>(AndyPoms) || Unknown || '''PERMANENT CLOSURE '''<br/>Creation of Grant St Plaza - pedestrain area in front of Bridgeport Hospital.  Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic). || [http://www.bridgeportct.gov/controls/NewsFeed.aspx?FeedID=477 City of Bridgeport]
| [https://www.waze.com/editor/?zoom=6&lat=41.18873&lon=-73.16687&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9168431 '''Grant St''']<br/>b/w Central & Mill Hill || 6/28/2012<br/>(AndyPoms) || Unknown || '''PERMANENT CLOSURE '''<br/>Creation of Grant St Plaza - pedestrian area in front of Bridgeport Hospital.  Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic). || [http://www.bridgeportct.gov/controls/NewsFeed.aspx?FeedID=477 City of Bridgeport]
|-
|-
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under Amtrak || 7/26/2013<br/>(CTGreybeard) || 1/1/2014 || Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B || [https://encrypted.google.com/url?sa=t&rct=j&q=project%200301-0070%20b&source=web&cd=1&ved=0CCoQFjAA&url=http%3A%2F%2Fwww.ct.gov%2Fdot%2Flib%2Fdot%2Fdocuments%2Fdpolicy%2Fmtp%2F2009mtp.pdf&ei=7vvzUYjOLan94APvsYC4Bg&usg=AFQjCNFnQvgg3P5Cxx0vnXA-vBAFSZ-eOA&sig2=spJmNHa54rHCxLDttLRtWQ&bvm=bv.49784469,d.dmg&cad=rjt Connecticut Master Transportation Plan] (search for the project number)
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under Amtrak || 7/26/2013<br/>(CTGreybeard) || 1/1/2014 || Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B || [https://encrypted.google.com/url?sa=t&rct=j&q=project%200301-0070%20b&source=web&cd=1&ved=0CCoQFjAA&url=http%3A%2F%2Fwww.ct.gov%2Fdot%2Flib%2Fdot%2Fdocuments%2Fdpolicy%2Fmtp%2F2009mtp.pdf&ei=7vvzUYjOLan94APvsYC4Bg&usg=AFQjCNFnQvgg3P5Cxx0vnXA-vBAFSZ-eOA&sig2=spJmNHa54rHCxLDttLRtWQ&bvm=bv.49784469,d.dmg&cad=rjt Connecticut Master Transportation Plan] (search for the project number)
|-
|}
== Cheshire ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="white"
| [https://www.waze.com/editor/?env=usa&lon=-72.87836&lat=41.53941&layers=5&zoom=7&segments=81025205 '''Blacks Rd''']<br/>btwn SR-10 & Wolf Hill || 2014-06-23<br/>(pumrum) || 2014-10-23 est<br/>(pumrum) || '''Added to Closure List || [http://www.cheshirect.org/roads-sidewalks-sewers-and-trees/road-maintenance-and-construction/ Town Closure Page]
|-
|-
|}
|}
Line 105: Line 112:
! scope="col" width="500" bgcolor="wheat" | Notes
! scope="col" width="500" bgcolor="wheat" | Notes
! scope="col" width="100" bgcolor="wheat" | Link
! scope="col" width="100" bgcolor="wheat" | Link
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=6&lat=41.14729&lon=-73.2556&layers=TBTTFFTTTTFTTTTTTTTTTTTFTT&segments=9151433,57630779,57630778,9148143,66717029,66717028,66717001,66717025 <b>Service Plaza</b>]<br/>CT-15 N & S
| 5/7/2012<br/>(Jallen)
| '''NB:'''12/12/12 (AndyPoms)<br/>'''SB:'''2/1/13 (AndyPoms)
| '''REOPENED<br/><del>SERVICE PLAZAS CLOSED</del>'''<br/>Part of reconstruction project of all CT Service Plazas
| [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.21865&lon=-73.25648&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66452345,66452322,66452363,66452341 <b>Service Plaza</b>]<br/>I-95 N & S
| [https://www.waze.com/editor/?zoom=6&lat=41.21865&lon=-73.25648&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66452345,66452322,66452363,66452341 <b>Service Plaza</b>]<br/>I-95 N & S
Line 117: Line 118:
| '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas
| '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas
| [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
| [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=7&lat=41.19241&lon=-73.22853&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=70328590 <b>Cornell Rd</b>]<br/>b/w Westbrook Pl & White Oak Rd
| 10/12/2012<br/>(AndyPoms)
| 7/28/2013<br/>CTGreybeard
| '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. '''NOTE:''' AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again.
| [http://www.fairfieldct.org/documents/2012/CornellRd.pdf Town of Fairfield]
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=7&lat=41.20099&lon=-73.22959&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68382338 <b>Merritt St</b>]<br/>at Valley Rd
| 11/27/2012<br/>(AndyPoms)
| 7/28/2013<br/>CTGreybeard
| '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area.
| [http://www.fairfieldct.org/ Town of Fairfield]
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?lon=-73.2904&lat=41.133&zoom=6&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=61713109 <b>Westway Rd</b>]<br/>across Amtrak
| 7/29/2013<br/>(CTGreybeard)
| 4/15/2014<br/>(AndyPoms - UR)
| '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>UPDATE 3/18/13- Westway Road between Pequot Avenue and Westford Drive in the Southport section of Fairfield. DETOUR INFO-Traffic will be detoured along Pequot Avenue, Old Post Road, Route 1 (Post Road), Kings Highway West and Oxford Road. Westway Road on either side of the railroad bridge will be open for local traffic only. Project #0301-0070 A
| [http://www.dotdata.ct.gov/iti/Data/ACTIVE_PROJECTS_20130502.xml Connecticut DOT] (search on project number)
|}
|}


Line 146: Line 129:
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.09924&lon=-73.68302&layers=BFTFFTTTTFTTFTTTTTTTTTTFT&segments=75168682 '''John St''']<br/>b/w Riversville Rd & Buckfield Ln || 8/16/2013<br/>(AndyPoms) || 10/3/2013<br/>(AndyPoms) || '''REOPENED'''<del><br/>'''Bridge Replacement Project'''</del><br/>Construction stared June 25, 2013 || [http://www.greenwichct.org/Government/Departments/Public_Works/Engineering_Division/John%20Street%20Bridge%20Flier%20-%20Website%20Final.pdf Town of Greenwich]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.04001&lon=-73.58343&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=73483736 '''Lockwood Ln''']<br/>b/w E Putnam Ave & Leonard Ave || 6/1/2013<br/>(AndyPoms) || 11/28/2013<br/>(AndyPoms) || '''REOPENED'''<del><br/>'''Bridge Replacement Project'''</del><br/>Construction stared April 1, 2013 || [http://www.greenwichct.org/Government/Departments/Public_Works/Engineering_Division/Stormwater_Information/Byram_River_Feasibility_Study_Info/Lockwood%20Lane%20Press%20Release%201.pdf Town of Greenwich]
|-
|}
|}


Line 186: Line 164:
|}
|}
'''*NOTE:''' The MDC only publishes approximately two weeks of closure & traffic pattern change information.  Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for ''CONFIRMED'' round-the-clock closures/traffic pattern changes.
'''*NOTE:''' The MDC only publishes approximately two weeks of closure & traffic pattern change information.  Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for ''CONFIRMED'' round-the-clock closures/traffic pattern changes.
== Ledyard==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-71.99587&lat=41.48072&layers=1925&zoom=3&segments=75296138,75296137 '''Shewville Rd''']<br/>b/w Fanning & Rte 2 || Approx<br/>7/1/2014<br/>(GooberKing) || Approx<br/>9/30/2014<br/>(GooberKing) || '''ROAD CLOSED'''<br/>Bridge replacement || [http://www.norwichbulletin.com/article/20140719/News/140719546 Norwich Bulletin]
|-
|}


== Madison ==
== Madison ==
Line 220: Line 211:
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=4&lat=41.57082&lon=-72.6487&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=65478194,65478199,63883313,62901442 '''Arrigoni Br''']<br/>b/w Middletown & Portland || 5/1/2011<br/>(AndyPoms) || Anticipated<br/>11/7/2012 || '''ONE LANE EACH DIRECTION'''<br/>Bridge Replacement<br/>No Closures-traffic pattern changes.<br/>'''Silver St''' b/w Brownstone and Main-One Way Westbound. || [http://www.ct.gov/dot/Arrigoni ConnDOT]
| [https://www.waze.com/editor/?zoom=4&lat=41.57082&lon=-72.6487&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=65478194,65478199,63883313,62901442 '''Arrigoni Br''']<br/>b/w Middletown & Portland || 5/1/2011<br/>(AndyPoms) || Anticipated<br/>11/7/2012 || '''ONE LANE EACH DIRECTION'''<br/>Bridge Replacement<br/>No Closures-traffic pattern changes.<br/>'''Silver St''' b/w Brownstone and Main-One Way Westbound. || [http://www.ct.gov/dot/Arrigoni ConnDOT]
|-
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-72.66378&lat=41.52602&layers=4&zoom=6&segments=81381241,8928840,81381239 '''RT 17 / S Main''']<br/>at Coleman Rd || 2014-09-05 7pm<br/>(pumrum) || <br/>2014-09-08 3pm (pumrum)|| '''ROAD CLOSED'''<br/>btwn Route 155 (Randolph Road) and Wesleyan Hills Road || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=552066 ConnDOT]
|-
|}
== Monroe ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-73.21305&lat=41.31986&layers=4&zoom=7&segments=81024859 '''Monroe Tpke''']<br/>b/w Cross Hill & Jeanette || 2014-08-11 0600<br/>(pumrum) || 2014-08-21 0600<br>(pumrum) || '''BRIDGE CLOSED'''<br/>Submitted to closure sheet || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=548900 ConnDOT]
|-
|-
|}
|}
Line 234: Line 240:
|-
|-
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-72.16394&lat=41.47331&layers=261&zoom=7&segments=81021872 '''Oakdale Rd''']<br/>b/w Fellows Rd & Simpson Ln || 2014-05-14<br/>(pumrum) || Oct 2014 || '''BRIDGE OUT''' || [http://www.theday.com/article/20140514/NWS01/140519860/1069/rss Closure Notice]<br>[http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=543974 DOT Notice]
| [https://www.waze.com/editor/?env=usa&lon=-72.15830&lat=41.46533&layers=4&zoom=6&segments=66654871 '''Oakdale Rd''']<br/>b/w Fellows Rd & Simpson Ln || 2014-05-14<br/>(pumrum) || 2014-10-14<br/>(pumrum) || '''BRIDGE MAINTENANCE''' || [http://www.theday.com/article/20140514/NWS01/140519860/1069/rss Closure Notice]<br>[http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=543974 DOT Notice]
|-
|-
|}
|}
Line 257: Line 263:
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.33042&lon=-72.90915&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9043024 '''E Rock Rd.''']<br/>b/w Livingston & Farnum || 6/14/2013<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.eastrockbridge.com/ E Rock Brg]
| [https://www.waze.com/editor/?zoom=7&lat=41.33042&lon=-72.90915&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9043024 '''E Rock Rd.''']<br/>b/w Livingston & Farnum || 6/14/2013<br/>(AndyPoms) || 4/30/2015<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.eastrockbridge.com/ E Rock Brg]
|- align="center" bgcolor="#ffff00"
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''CT-34''']<br/>At Exit 2 || 5/1/2013<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Downtown Crossing Project<br/>Closure Starts 5/2/2013 || [http://www.cityofnewhaven.com/Mayor/ReadMore.asp?ID={DEBDCB38-A728-4567-9D10-836C7DD23432} City of New Haven]
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''CT-34''']<br/>At Exit 2 || 5/1/2013<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Downtown Crossing Project<br/>Closure Starts 5/2/2013 || [http://www.cityofnewhaven.com/Mayor/ReadMore.asp?ID={DEBDCB38-A728-4567-9D10-836C7DD23432} City of New Haven]
Line 296: Line 302:
|- align="center"
|- align="center"
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=61941475&env=usa '''Taylor Ave''']<br/>b/w Connecticut Ave (US-1) & Church St || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=61941475&env=usa '''Taylor Ave''']<br/>b/w Connecticut Ave (US-1) & Church St || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.10486&lon=-73.42863&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61941471 '''Cedar St.''']<br/>b/w Connecticut Ave (US-1) & Summit Ave || 8/21/2012<br/>(AndyPoms) || 11/22/2013<br/>(AndyPoms/UR) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=508658 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.10894&lon=-73.39377&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67027891 '''Triangle St.''']<br/>b/w Norden Plaza & Howard Ave || 7/29/2012<br/>(AndyPoms) || 6/17/2013<br/>(CTGreyBeard) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=502644 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.09842&lon=-73.43953&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67306886 '''Rampart Rd''']<br/>b/w Connecticut Ave & Jomar Rd || 2/10/2012<br/>(Jallen) || 8/13/2012<br/>(jeberhard) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=475858 ConnDOT]
|-
|-
|}
|}
Line 404: Line 401:
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || Approx<br/>8/1/20XX<br/>(USER) || Approx<br/>9/7/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || Approx<br/>8/1/20XX<br/>(USER) || Approx<br/>9/7/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
|- align="center"
| [https://www.waze.com/editor/?env=usa&lon=-72.84646&lat=41.64982&layers=3047&zoom=6&segments=8977100 '''Shuttle Meadow Rd''']<br/>b/w Flanders & Ledge || Approx<br/>4/15/20XX<br/>(USER) || Approx<br/>11/15/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Seasonal Closure per<br/>Southington PD ||
|-
|-
|}
|}



Revision as of 15:36, 30 April 2015

Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.

Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.

Major Events

These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.

What When Where Link Status
Hartford Marathon Yearly
2nd Sat in Oct
Hartford
E/W Hartford
Closures 2014 - In Progress
(pumrum)

Minor Events

These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.

What When Where Link Status
Riverwalk Yearly
July 4th Wknd
Hartford
E Hartford
Closures 2014 - Submitted
(pumrum)
Manchester Road Race Yearly
Thanksgiving Day
Manchester [1] 2014 - Submitted
(pumrum)
First Night Hartford Yearly
New Years Eve
Hartford Event Site 2014 - Not Yet Submitted

Branford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
6/28/2012
(AndyPoms)
NB:10/3/2013
(AndyPoms)
SB:Closed
SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Bridgeport

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Grant St
b/w Central & Mill Hill
6/28/2012
(AndyPoms)
Unknown PERMANENT CLOSURE
Creation of Grant St Plaza - pedestrian area in front of Bridgeport Hospital. Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic).
City of Bridgeport
South Ave
Under Amtrak
7/26/2013
(CTGreybeard)
1/1/2014 Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B Connecticut Master Transportation Plan (search for the project number)

Cheshire

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Blacks Rd
btwn SR-10 & Wolf Hill
2014-06-23
(pumrum)
2014-10-23 est
(pumrum)
Added to Closure List Town Closure Page

Cornwall

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cornwall Hollow Rd
btwn Johnson and Lake
2014-08-28 0900
(pumrum)
2014-09-24 1500
(pumrum)
Added to Closure List CT-DOT Project 0031-0128

Darien

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
3/22/2012
(AndyPoms)
NB:6/6/2013
(AndyPoms)
SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Fairfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
NB:7/18/2013
(AndyPoms)
SB:9/26/2103
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Greenwich

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Griswold

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edmond Rd
b/w Hopeville Rd & Dudek Rd
3/29/2013
(AndyPoms)
1/30/2014
(AndyPoms - MP)
BRIDGE REPLACEMENT
The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road.
Town of Griswold

Hartford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Elliott St E
b/w Wethersfield & Ledyard St
10/14/2012
(AndyPoms)
11/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED

MDC Sewer Separation Project
MDC
Flower St
b/w Farmington & Capital
11/27/2012
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Busway Construction
Closure Starts 12/3/2012
CT fastrak
Granby St
b/w Tower & Ledyard
10/14/2012
(AndyPoms)
Unknown ROAD CLOSED
MDC Sewer Separation Project
MDC
Jewell St
b/w Ann Uccello St and Trumbull St
Approx
7/14/2014
(ploben)
Unknown WESTBOUND TRAFFIC CLOSED First Hand
Sigourney St.
b/w Homestead & Sargent
4/1/2012
(AndyPoms)
6/13/2013
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.

Ledyard

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Shewville Rd
b/w Fanning & Rte 2
Approx
7/1/2014
(GooberKing)
Approx
9/30/2014
(GooberKing)
ROAD CLOSED
Bridge replacement
Norwich Bulletin

Madison

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
NB:10/3/2013
(AndyPoms)
SB:TBA
UNKNOWN SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Manchester

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edgarton St
btwn Lodge Dr & Edgarton St
01/01/2010
(ploben)
Unplanned
(ploben)
Sinkhole Article

Middletown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Arrigoni Br
b/w Middletown & Portland
5/1/2011
(AndyPoms)
Anticipated
11/7/2012
ONE LANE EACH DIRECTION
Bridge Replacement
No Closures-traffic pattern changes.
Silver St b/w Brownstone and Main-One Way Westbound.
ConnDOT
RT 17 / S Main
at Coleman Rd
2014-09-05 7pm
(pumrum)

2014-09-08 3pm (pumrum)
ROAD CLOSED
btwn Route 155 (Randolph Road) and Wesleyan Hills Road
ConnDOT

Monroe

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Monroe Tpke
b/w Cross Hill & Jeanette
2014-08-11 0600
(pumrum)
2014-08-21 0600
(pumrum)
BRIDGE CLOSED
Submitted to closure sheet
ConnDOT

Montville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Montville Rd
b/w Salen Tpke & Leffingwell Rd
11/1/2012
(AndyPoms)
Unknown BRIDGE OUT
AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out."
Permit Process Begun (Jul 2014)
Latest News
Oakdale Rd
b/w Fellows Rd & Simpson Ln
2014-05-14
(pumrum)
2014-10-14
(pumrum)
BRIDGE MAINTENANCE Closure Notice
DOT Notice

New Britain

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Long Swamp Rd
b/w Slater Rd & Alton Brooks Way
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way."

AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not.
User Report

New Haven

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
E Rock Rd.
b/w Livingston & Farnum
6/14/2013
(AndyPoms)
4/30/2015
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
E Rock Brg
CT-34
At Exit 2
5/1/2013
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Downtown Crossing Project
Closure Starts 5/2/2013
City of New Haven
State St.
b/w Lawrence & James
10/12/2010
(AndyPoms)
Anticipated
10/2011
2/2012
4/30/2013
Unknown
ROAD CLOSED
Bridge Replacement (CT DOT Project #0092-0561)
ConnDOT
Trumbull St.
b/w Orange & Whitney
11/28/2011
(AndyPoms)
3/12/2013
(AndyPoms)
REOPENED TWO WAY
ONE WAY (WESTBOUND)
Sewer Separation Project
City of New Haven
I-95
b/w Exit 46 & Exit 54
June 2002
Anticipated
Fall 2016
MAJOR PROJECT
Expect Lane & Road & Ramp Closures at all times (mostly overnight)
I-95 New Haven
Yale Ave
b/w Derby & Chapel
7/30/2012
(AndyPoms)
8/30/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Newtown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
b/w Underhill Rd & Lake Dr
7/15/2013
(AndyPoms)
Approx
8/2/2013
ROAD CLOSED
for overhead bridge rehibilitation
ConnDOT

Norwalk

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Fairfield Ave
b/w Connecticut Ave (US-1) & Reed St Ext
12/5/2013
(AndyPoms)
Winter 2014 ROAD CLOSED
Bridge Replacement
Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date.
ConnDOT
Taylor Ave
b/w Connecticut Ave (US-1) & Church St
12/5/2013
(AndyPoms)
Winter 2014 ROAD CLOSED
Bridge Replacement
Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date.
ConnDOT

Orange

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Plainville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Stillwell Dr
b/w Linsley Dr & Rosemont Dr
7/21/2013
(AndyPoms)
2/22/2014
(AndyPoms)
BRIDGE REPLACEMENT
Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River.
Plainville

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Simpaug Tpke
b/w Marchant Rd & Picketts Ridge Rd
10/10/2011
(Jallen)
Anticipated
June 2012
10/29/2012
12/6/2012
Bridge Replacement
Replacement of the bridge over the Metro-North Railroad

Rockville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
W Main St
btwn West St & Maple St
04/01/2014
(ploben)
11/01/2014
(ploben)
BRIDGE CONSTRUCTION [2]

Stamford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edison Rd
b/w Merrell Ave & Stamford Hospital
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project
Stamford Hospital

Westport

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
North Ave
at Coleytown Rd
3/29/2013
(AndyPoms)
Approx
4/14/2013
BRIDGE REPLACEMENT
Road Closed north of Coleytown Rd to complete bridge reconstruction.
Town of Westport
Ketchum St
b/w Riverside Ave & #7 Ketchum
2/8/2013
(AndyPoms)
Approx
4/14/2013
ROAD CLOSED
Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12
Town of Westport

Wolcott

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
at Woodtick Rd
6/27/2013
(CTGreybeard)
9/29/2013
(AndyPoms/UR)
ROAD CLOSED
Road Construction at the intersection of Center Street and Woodtick Road See link at right.
Town of Wolcott

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open
Shuttle Meadow Rd
b/w Flanders & Ledge
Approx
4/15/20XX
(USER)
Approx
11/15/20XX
(USER)
ROAD CLOSED
Seasonal Closure per
Southington PD

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME>
b/w <CROSS STREETS>
Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>