Connecticut/Closures: Difference between revisions Discussion View history

 
(61 intermediate revisions by 9 users not shown)
Line 1: Line 1:
Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[How to handle road closures]] before making changes to the map & this page.
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page.


<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>
<!-- <del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>


<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>


<del>Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week).  At this point please only map closures that are in effect for more than two weeks.</del>
<del>Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week).  At this point please only map closures that are in effect for more than two weeks.</del>
    These del comments are currently not visible and likely should be removed.
-->
Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by [[24-hour format|2200 UTC]] in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.


Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates.  At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.
==Major Events==
 
These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.
== Bethel ==
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="100" bgcolor="wheat" |What
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="100" bgcolor="wheat" |When
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="100" bgcolor="wheat" |Where
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat" |Link
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Status
|- align="center"
|- align="center" bgcolor="yellow"
| [https://www.waze.com/editor/?lon=-73.39804&lat=41.39093&zoom=6&layers=BFTFFTTTTFTTFTTTTTTTTTTFT&segments=66943419,68260565,66943420 '''Walnut Hill Rd''']<br/>near Taylor Rd || 4/1/2013<br/>(CTGreybeard) || Anticipated<br/>9/18/2013 || '''BRIDGE CLOSED'''<br/>Rebuild aging bridge over Limekiln Brook on Walnut Hill Rd. || [http://www.bethel-ct.gov/controls/NewsFeed.aspx?FeedID=14 Town of Bethel]
|Hartford Marathon||Yearly<br>2nd Sat in Oct||Hartford<br>E/W Hartford||[http://www.hartfordmarathon.com/Events/NU_Hartford_Marathon/Road_Closures___CT_Transit.htm Closures]||2014 - In Progress<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|-
|}
|}


== Branford ==
==Minor Events==
These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="100" bgcolor="wheat" |What
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="100" bgcolor="wheat" |When
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="100" bgcolor="wheat" |Where
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat" |Link
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Status
|- align="center"
|- align="center" bgcolor="lime"
| [https://www.waze.com/editor/?zoom=5&lat=41.28694&lon=-72.83399&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66019910,62052284 '''Service Plaza''']<br/>I-95 N & S || 6/28/2012<br/>(AndyPoms) || NB:10/3/2013<br/>(AndyPoms)<br/>SB:Closed || '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|Riverwalk||Yearly<br>July 4th Wknd||Hartford<br>E Hartford||[http://patch.com/connecticut/shelton/road-closures-for-riverwalk-fireworks-july-3 Closures]||2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="lime"
|Manchester Road Race||Yearly<br>Thanksgiving Day||Manchester||[https://www.manchesterroadrace.com/CourseMapShell.html]||2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
|- align="center" bgcolor="white"
|First Night Hartford||Yearly<br>New Years Eve||Hartford||[http://www.firstnighthartford.org/ Event Site]||2014 - Not Yet Submitted
|-
|-
|}
|}


== Bridgeport ==
==Annual Closures==
{| border="1" width="100%"
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.18873&lon=-73.16687&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9168431 '''Grant St''']<br/>b/w Central & Mill Hill || 6/28/2012<br/>(AndyPoms) || Unknown || '''PERMANENT CLOSURE '''<br/>Creation of Grant St Plaza - pedestrain area in front of Bridgeport Hospital.  Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic). || [http://www.bridgeportct.gov/controls/NewsFeed.aspx?FeedID=477 City of Bridgeport]
|-
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under Amtrak || 7/26/2013<br/>(CTGreybeard) || 1/1/2014 || Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B || [https://encrypted.google.com/url?sa=t&rct=j&q=project%200301-0070%20b&source=web&cd=1&ved=0CCoQFjAA&url=http%3A%2F%2Fwww.ct.gov%2Fdot%2Flib%2Fdot%2Fdocuments%2Fdpolicy%2Fmtp%2F2009mtp.pdf&ei=7vvzUYjOLan94APvsYC4Bg&usg=AFQjCNFnQvgg3P5Cxx0vnXA-vBAFSZ-eOA&sig2=spJmNHa54rHCxLDttLRtWQ&bvm=bv.49784469,d.dmg&cad=rjt Connecticut Master Transportation Plan] (search for the project number)
|-
|}
 
== Chester ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=8&lat=41.40419&lon=-72.44911&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69261145 '''Water St''']<br/>b/w N Main St & E Liberty St || 11/9/2012<br/>(AndyPoms) || 12/24/2012<br/>(AndyPoms)) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Description || [http://chesterct.org/?p=883 Town of Chester]
|-
|}
 
== Darien ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=3&lat=41.07547&lon=-73.48182&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67161734,67161735,64979948,64979945 '''Service Plaza''']<br/>I-95 N & S || 3/22/2012<br/>(AndyPoms) || '''NB:'''6/6/2013<br/>(AndyPoms) || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|}
 
== Fairfield ==
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat" |Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Link
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=6&lat=41.14729&lon=-73.2556&layers=TBTTFFTTTTFTTTTTTTTTTTTFTT&segments=9151433,57630779,57630778,9148143,66717029,66717028,66717001,66717025 '''Service Plaza''']<br/>CT-15 N & S || 5/7/2012<br/>(Jallen) || '''NB:'''12/12/12 (AndyPoms)<br/>'''SB:'''2/1/13 (AndyPoms) || '''REOPENED<br/><del>SERVICE PLAZAS CLOSED</del>'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.21865&lon=-73.25648&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66452345,66452322,66452363,66452341 '''Service Plaza''']<br/>I-95 N & S || '''NB:'''7/18/2013<br/>(AndyPoms)<br/>'''SB:'''9/26/2103<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|[https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br />b/w Derby & Chapel||Approx<br />8/1/20XX<br />(USER)||Approx<br />9/7/20XX<br />(USER)||'''ROAD CLOSED'''<br />Annual Closure for<br />New Haven Open Tennis Tournament||[http://www.newhavenopen.com/ NH Open]
|-
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=7&lat=41.19241&lon=-73.22853&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=70328590 '''Cornell Rd''']<br/>b/w Westbrook Pl & White Oak Rd || 10/12/2012<br/>(AndyPoms) || 7/28/2013<br/>CTGreybeard || '''REOPENED'''<br/>'''BRIDGE REPLACEMENT'''<br/>Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. '''NOTE:''' AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again. || [http://www.fairfieldct.org/documents/2012/CornellRd.pdf Town of Fairfield]
|-
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=7&lat=41.20099&lon=-73.22959&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68382338 '''Merritt St''']<br/>at Valley Rd || 11/27/2012<br/>(AndyPoms) || 7/28/2013<br/>CTGreybeard || '''REOPENED'''<br/>'''BRIDGE REPLACEMENT'''<br/>Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area. || [http://www.fairfieldct.org/ Town of Fairfield]
|- align="center"
|- align="center"
| [https://www.waze.com/editor/?lon=-73.2904&lat=41.133&zoom=6&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=61713109 '''Westway Rd''']<br/>across Amtrak || 7/29/2013<br/>(CTGreybeard) || 1/15/2014 (Sched.) || '''BRIDGE REPLACEMENT'''<br/>UPDATE 3/18/13- Westway Road between Pequot Avenue and Westford Drive in the Southport section of Fairfield. DETOUR INFO-Traffic will be detoured along Pequot Avenue, Old Post Road, Route 1 (Post Road), Kings Highway West and Oxford Road. Westway Road on either side of the railroad bridge will be open for local traffic only. Project #0301-0070 A || [http://www.dotdata.ct.gov/iti/Data/ACTIVE_PROJECTS_20130502.xml Connecticut DOT] (search on project number)
|[https://www.waze.com/editor/?env=usa&lon=-72.84646&lat=41.64982&layers=3047&zoom=6&segments=8977100 '''Shuttle Meadow Rd''']<br />b/w Flanders & Ledge||Approx<br />4/15/20XX<br />(USER)||Approx<br />11/15/20XX<br />(USER)||'''ROAD CLOSED'''<br />Seasonal Closure per<br />Southington PD||
|-
|-
|}


== Greenwich ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.09924&lon=-73.68302&layers=BFTFFTTTTFTTFTTTTTTTTTTFT&segments=75168682 '''John St''']<br/>b/w Riversville Rd & Buckfield Ln || 8/16/2013<br/>(AndyPoms) || 10/3/2013<br/>(AndyPoms) || '''REOPENED'''<del><br/>'''Bridge Replacement Project'''</del><br/>Construction stared June 25, 2013 || [http://www.greenwichct.org/Government/Departments/Public_Works/Engineering_Division/John%20Street%20Bridge%20Flier%20-%20Website%20Final.pdf Town of Greenwich]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.04001&lon=-73.58343&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=73483736 '''Lockwood Ln''']<br/>b/w E Putnam Ave & Leonard Ave || 6/1/2013<br/>(AndyPoms) || 11/28/2013<br/>(AndyPoms) || '''REOPENED'''<del><br/>'''Bridge Replacement Project'''</del><br/>Construction stared April 1, 2013 || [http://www.greenwichct.org/Government/Departments/Public_Works/Engineering_Division/Stormwater_Information/Byram_River_Feasibility_Study_Info/Lockwood%20Lane%20Press%20Release%201.pdf Town of Greenwich]
|-
|}
|}


== Griswold ==
==Danbury==
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat" |Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.60993&lon=-71.9391&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=72142079 '''Edmond Rd''']<br/>b/w Hopeville Rd & Dudek Rd || 3/29/2013<br/>(AndyPoms) || 1/30/2014<br/>(AndyPoms - MP) || '''BRIDGE REPLACEMENT'''<br/>The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November.  During the construction period, a detour will direct trafficaround the closure via Norman Road.
|| [http://www.griswold-ct.org/ Town of Griswold]
|-
|-
|}
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.42195&lat=41.40524&s=120952083&zoom=8&segments=511450068 '''Old Newtown Rd''']
 
|Approx<br />9/8/20<br />(Jallen)
== Hamden ==
|Approx<br />11/6/20<br />(Jallen)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Intersection and safety improvements
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://www.dropbox.com/sh/zvkigvewg85lyfz/AACfCj9WwE9O-x0hskaSV-G1a?dl=0 BOTG Pics]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
[https://portal.ct.gov/DOT/Construction-News-from-the-Connecticut-Department-of-Transportation/2020/Intersection-and-Safety-Improvements-on-SR-806-Newtown-Road-in-Danbury DOT Info]
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=5&lat=41.43258&lon=-72.90059&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=67825142 '''Tuttle Ave''']<br/>b/w Dunn Rd & River Rd || 12/4/2012<br/>(AndyPoms) || 7/19/2013<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant.   At this time they do not promise,  but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring." || [http://www.hamden.com/ Town of Hamden]
|-
|-
|}
|}


== Hartford ==
==Putnam==
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat" |Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.7469&lon=-72.67183&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9003282 '''Elliott St E''']<br/>b/w Wethersfield & Ledyard St || 10/14/2012<br/>(AndyPoms) || 11/12/2012<br/>(AndyPoms) || '''REOPENED<br/><del>ROAD CLOSED</del>''' <br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.76565&lon=-72.68788&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69664315,69664313 '''Flower St''']<br/>b/w Farmington & Capital || 11/27/2012<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Busway Construction<br/>Closure Starts 12/3/2012 || [http://www.ctfastrak.com/index.php/en/component/content/article/22-construction-articles/149-construction-bulletin-november-26-2012 CT fastrak]
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.79394&lon=-72.70343&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=8994280,9016890,9010620,9010622,9016713,9016893,8997086,9010497,8990817,9016888,8997085,8990904,64202390,64202389 '''Granby St''']<br/>b/w Tower & Ledyard || 10/14/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=6&lat=41.77651&lon=-72.6908&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9014765 '''Sigourney St.''']<br/>b/w Homestead & Sargent || 4/1/2012<br/>(AndyPoms) || 6/13/2013<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=500982 ConnDOT]
|-
|-
|}
|[https://www.waze.com/editor/ '''Modock Rd''']
'''*NOTE:''' The MDC only publishes approximately two weeks of closure & traffic pattern change information.  Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for ''CONFIRMED'' round-the-clock closures/traffic pattern changes.
|Approx<br />10/18/20<br />(Jallen)
 
|Approx<br />12/21/20<br />(Jallen)
== Killingly ==
|'''ROAD CLOSED'''<br />Air Trail Construciton
{| border="1" width="100%"
|[https://www.norwichbulletin.com/news/20200409/access-work-begins-on-pomfrets-air-line-trail-section <LINK>]
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?lon=-71.84612&lat=41.88521&zoom=7&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68923654 '''River Rd''']<br/>b/w Mason Hill Rd & Cutler Rd || 10/26/2012<br/>(AndyPoms) || 11/3/2012<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening.<br/>'''UPDATE 11/3/2012:''' According to Town Manager, There are two bridges on River Road in Killingly.  Both bridges were closed to traffic in April 2011 due to storm damage.  Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...) || [http://www.killingly.org/ Town of Killingly]
|-
|-
|}
|[Https://www.waze.com/en-US/editor%3Fenv%3Dusa%26lon%3D-71.91396%26lat%3D41.88964%26s%3D3342204415%26zoom%3D8%26segments%3D85236239 '''River Rd''']
 
|Approx<br />10/16/20<br />(harrypotter418)
== Madison ==
|Approx<br />12/31/20<br />(harrypotter418)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Excavation & installation of tunnel
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://www.putnamct.us/sites/g/files/vyhlif3711/f/minutes/trails_committee_meeting_minutes_august_27_2019.pdf Trails Committe Info]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.29088&lon=-72.58042&layers=TBTTFFTTTTTTTTTTTTTTTTTFTT '''Service Plaza''']<br/>I-95 N & S || NB:10/3/2013<br/>(AndyPoms)<br/>SB:TBA || UNKNOWN|| '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|-
|}
|}


== Meriden ==
==Redding==
{| border="1" width="100%"
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat" |Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.53042&lon=-72.80951&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66580324 '''Cook Ave''']<br/>b/w Summer St & Meridian St || 10/10/2012<br/>(AndyPoms) || 12/12/2012<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement<br/>CT DOT Project 79-215. || [http://www.cityofmeriden.org/SpecialAnnouncements/Customer-Files/CT-DOT-Project79-Rt71-Reconstruction.pdf ConnDOT]
|-
|-
|}
|[https://www.waze.com/editor/ '''Station Rd''']
 
|Approx<br />10/5/20<br />(Jallen)
== Middletown ==
|Approx<br />12/21/20<br />(Jallen)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Bridge Replacement
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://www.constructionjournal.com/projects/details/f43ae094acb14a889ece8d605f06fc12.html Const Journal]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
[https://www.facebook.com/ReddingCT/posts/station-road-will-be-closed-for-the-bridge-replacement-project-starting-monday-s/3333308350080944/ Redding FB]
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=4&lat=41.57082&lon=-72.6487&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=65478194,65478199,63883313,62901442 '''Arrigoni Br''']<br/>b/w Middletown & Portland || 5/1/2011<br/>(AndyPoms) || Anticipated<br/>11/7/2012 || '''ONE LANE EACH DIRECTION'''<br/>Bridge Replacement<br/>No Closures-traffic pattern changes.<br/>'''Silver St''' b/w Brownstone and Main-One Way Westbound. || [http://www.ct.gov/dot/Arrigoni ConnDOT]
|-
|-
|}
|}


== Montville ==
==Waterbury==
{| border="1" width="100%"
This is the template for the tables in this page.
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="500" bgcolor="wheat" |Notes
|- align="center" bgcolor="#00ff00"
! scope="col" width="100" bgcolor="wheat" |Link
| [https://www.waze.com/editor/?zoom=5&lat=41.47328&lon=-72.11724&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=64022292,66570467,66570466 '''Service Plaza''']<br/>I-395 S || 10/22/2012<br/>(AndyPoms) || 11/28/2013<br/>(AndyPoms) || '''REOPENED'''<del><br/>'''SERVICE PLAZA CLOSED'''</del><br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|- align="center"
| [https://www.waze.com/editor/?zoom=8&lat=41.50205&lon=-72.12262&layers=BTTFTTTTTTTTTTTTTTTTFT&segments=69065802 '''Montville Rd''']<br/>b/w Salen Tpke & Leffingwell Rd || 11/1/2012<br/>(AndyPoms) || Unplanned || '''BRIDGE OUT'''<br/>AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out." || User Report
|-
|-
|}
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.04739&lat=41.55059&s=53843219&zoom=6&segments=70584266 '''Exit 19 Off-Ramp''' (I-84 Westbound to Route 8 Southbound)]
 
|Approx<br />10/18/20<br />(Jallen)
== Naugatuck ==
|Approx<br />10/24/20<br />(Jallen)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Mixmaster construction
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.50144&lon=-73.04872&layers=BTTFFTTTTFTTFTTTTTTTTTFTT&segments=66392468 '''CT-8S Ramp''']<br/>On Ramp at Exit 28 || 7/9/2013<br/>(AndyPoms) || 11/25/2013<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''RAMP CLOSED'''</del><br/>The ramp closure is required for construction of retaining walls and fencing necessary for the completion of the Pedestrian Greenway along the Naugatuck River. || [http://www.naugatuck-ct.gov/controls/NewsFeed.aspx?FeedID=459 Naugatuck]
|-
|-
|}
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.04377&lat=41.55199&s=53843219&zoom=7&segments=61698396 '''Bank Street On-Ramp''' (I-84 Westbound to Route 8 Southbound)]
 
|Approx<br />10/18/20<br />(Jallen)
== New Britain ==
|Approx<br />10/24/20<br />(Jallen)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Mixmaster construction
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.68509&lon=-72.8097&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69436156 '''Long Swamp Rd''']<br/>b/w Slater Rd & Alton Brooks Way || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>'''UR:''' "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way."<br/><br/>AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials.  Unknown if permanent closure of Long Swamp Rd or not. || User Report
|-
|-
|}
|[https://www.waze.com/en-US/editor?env=usa&lon=-73.05063&lat=41.55065&s=53843219&zoom=6&segments=61698556,518497101 '''Exit 33 Ramp''' (SR-8 NB to I-84 WB)]
 
|Approx<br />9/25/20<br />(Jallen)
== New Canaan ==
|Approx<br />1/3/21<br />(Jallen)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Mixmaster construction
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[https://mixmaster-rehab.com/the-project/about-the-project DOT]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=7&lat=41.1737&lon=-73.47857&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=71296327 '''Mariomi Rd''']<br/>b/w Valley Rd & Thayer Pond Rd || 2/15/2013<br/>(AndyPoms) || 6/11/2013<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Started May, 2012, reported by user Feb, 2013.  Project anticipated to last 1 year. || [http://www.newcanaan.info/controls/NewsFeed.aspx?FeedID=337 Town of New Canaan]
|-
|-
|}
|}


== New Haven ==
==Template==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.33042&lon=-72.90915&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9043024 '''E Rock Rd.''']<br/>b/w Livingston & Farnum || 6/14/2013<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.eastrockbridge.com/ E Rock Brg]
|- align="center" bgcolor="#ffff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''CT-34''']<br/>At Exit 2 || 5/1/2013<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Downtown Crossing Project<br/>Closure Starts 5/2/2013 || [http://www.cityofnewhaven.com/Mayor/ReadMore.asp?ID={DEBDCB38-A728-4567-9D10-836C7DD23432} City of New Haven]
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''State St.''']<br/>b/w Lawrence & James || 10/12/2010<br/>(AndyPoms) || Anticipated<br/><del>10/2011</del><br/><del>2/2012</del><br/>4/30/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement (CT DOT Project #0092-0561) || [http://www.gm2inc.com/projects/state-street/ ConnDOT]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.31229&lon=-72.92109&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61834533,9079895 '''Trumbull St.''']<br/>b/w Orange & Whitney || 11/28/2011<br/>(AndyPoms) || 3/12/2013<br/>(AndyPoms) || '''REOPENED TWO WAY'''<br/><del>'''ONE WAY''' (WESTBOUND)</del><br/>Sewer Separation Project || [http://www.cityofnewhaven.com/TrafficParking/advisories.asp City of New Haven]
|- align="center"
| [https://www.waze.com/editor/?zoom=4&lat=41.30163&lon=-72.90983&layers=BTTFTTTFTTTTTTTTTTTTFT '''I-95''']<br/>b/w Exit 46 & Exit 54 || June 2002<br/> || Anticipated<br/>Fall 2016 || '''MAJOR PROJECT'''<br/>Expect Lane & Road & Ramp Closures at all times (mostly overnight) || [http://www.i95newhaven.com I-95 New Haven]
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || 7/30/2012<br/>(AndyPoms) || 8/30/2012<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
|-
|}
 
== Newtown ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.43614&lon=-73.24723&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9159130 '''Center St''']<br/>b/w Underhill Rd & Lake Dr || 7/15/2013<br/>(AndyPoms) || Approx<br/>8/2/2013 || '''ROAD CLOSED'''<br/>for overhead bridge rehibilitation || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=527892 ConnDOT]
|-
|}
 
== Norwalk ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=64073136&env=usa '''Fairfield Ave''']<br/>b/w Connecticut Ave (US-1) & Reed St Ext || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
|-
|- align="center"
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=61941475&env=usa '''Taylor Ave''']<br/>b/w Connecticut Ave (US-1) & Church St || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.10486&lon=-73.42863&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61941471 '''Cedar St.''']<br/>b/w Connecticut Ave (US-1) & Summit Ave || 8/21/2012<br/>(AndyPoms) || 11/22/2013<br/>(AndyPoms/UR) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=508658 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.10894&lon=-73.39377&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67027891 '''Triangle St.''']<br/>b/w Norden Plaza & Howard Ave || 7/29/2012<br/>(AndyPoms) || 6/17/2013<br/>(CTGreyBeard) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=502644 ConnDOT]
|-
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=6&lat=41.09842&lon=-73.43953&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67306886 '''Rampart Rd''']<br/>b/w Connecticut Ave & Jomar Rd || 2/10/2012<br/>(Jallen) || 8/13/2012<br/>(jeberhard) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=475858 ConnDOT]
|-
|}
 
== Orange ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.27983&lon=-73.04845&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=67960805,67960804,67960794,67960810,67960813,67960814 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|}
 
== Plainfield ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=5&lat=41.75423&lon=-71.87763&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=64988394,66455378,64988391,66455452 '''Service Plaza''']<br/>I-395 N & S || 6/21/2012<br/>(AndyPoms) || 10/22/2012<br/>(AndyPoms) || '''REPOPENED'''<br/><del>'''SERVICE PLAZAS CLOSED'''</del><br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
|}
 
== Plainville ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://editor-beta.waze.com/usa/#?zoom=6&lat=41.65685&lon=-72.85982&layers=TBTTFFTTTTFTTTTTTTTTTTTFTT&segments=74557145 '''Stillwell Dr''']<br/>b/w Linsley Dr & Rosemont Dr|| 7/21/2013<br/>(AndyPoms) || Anticipated<br/>September 2013 || '''BRIDGE REPLACEMENT'''<br/>Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River. || [http://www.plainvillect.com/News/news_details.aspx?id=1569 Plainville]
|-
|}
 
== Redding ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.31494&lon=-73.44559&layers=BFTFFTTTTTTFTTTTTTTTTFT&segments=69723388 '''Simpaug Tpke''']<br/>b/w Marchant Rd & Picketts Ridge Rd || 10/10/2011<br/>(Jallen) || Anticipated<br/><del>June 2012</del><br/><del>10/29/2012</del><br/>12/6/2012 || '''Bridge Replacement'''<br/>Replacement of the bridge over the Metro-North Railroad ||
|-
|}
 
== Stamford ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.0547&lon=-73.55461&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9151240 '''Edison Rd''']<br/>b/w Merrell Ave & Stamford Hospital || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project || [http://www.stamfordhospital.org/ Stamford Hospital]
|-
|}
 
== Trumbull ==
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=5&lat=41.23206&lon=-73.23212&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9189413 '''Madison Ave''']<br/>b/w Plattsville Rd & Hitching Post Ln || 7/9/2012<br/>(AndyPoms) || 9/28/2012<br/>(AndyPoms) ||'''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=507618 ConnDOT]
|-
|}
 
== Westport ==
This is the template for the tables in this page.
This is the template for the tables in this page.
{| border="1" width="100%"
{| class="sortable mw-collapsible" border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="200" bgcolor="wheat" |Road Name<br />Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |Start Date<br />(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat" |End Date<br />(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="500" bgcolor="wheat" |Notes
! scope="col" width="100" bgcolor="wheat"| Link
! scope="col" width="100" bgcolor="wheat" |Link
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.18083&lon=-73.35087&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=72132081 '''North Ave''']<br/>at Coleytown Rd || 3/29/2013<br/>(AndyPoms) || Approx<br/>4/14/2013 || '''BRIDGE REPLACEMENT'''<br/>Road Closed north of Coleytown Rd to complete bridge reconstruction. || [http://www.westportct.gov/index.aspx?recordid=1609&page=35 Town of Westport]
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.12165&lon=-73.37136&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9190067 '''Ketchum St''']<br/>b/w Riverside Ave & #7 Ketchum || 2/8/2013<br/>(AndyPoms) || Approx<br/>4/14/2013 || '''ROAD CLOSED'''<br/>Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction.  See link to right, Item #12 || [http://www.westportct.gov/Modules/ShowDocument.aspx?documentid=4244 Town of Westport]
|-
|-
|}
|[https://www.waze.com/editor/ '''<ROAD NAME>''']
 
|Approx<br />1/1/20XX<br />(<USER>)
== Wolcott ==
|Approx<br />9/7/20XX<br />(<USER>)
{| border="1" width="100%"
|'''ROAD CLOSED'''<br />Description
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
|[http://www.waze.com/ <LINK>]
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=5&lat=41.59671&lon=-72.96113&layers=BFTFFTTTTTTTFTTTTTTTTTFTT&segments=9064807 '''Center St''']<br/>at Woodtick Rd || 6/27/2013<br/>(CTGreybeard) || 9/29/2013<br/>(AndyPoms/UR) || '''ROAD CLOSED'''<br/>Road Construction at the intersection of Center Street and Woodtick Road See link at right. || [http://www.wolcottct.org/news/news_details.aspx?id=503 Town of Wolcott]
|-
|}
 
== Annual Closures ==
This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || Approx<br/>8/1/20XX<br/>(USER) || Approx<br/>9/7/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
|-
|-
|}
|}
== Template ==
This is the template for the tables in this page.
{| border="1" width="100%"
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
! scope="col" width="500" bgcolor="wheat"| Notes
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
| [https://www.waze.com/editor/ '''<ROAD NAME>''']<br/>b/w <CROSS STREETS> || Approx<br/>1/1/20XX<br/>(<USER>) || Approx<br/>9/7/20XX<br/>(<USER>) || '''ROAD CLOSED'''<br/>Description || [http://www.waze.com/ <LINK>]
|-
|}


[[Category:Connecticut]]
[[Category:Connecticut]]
[[Category:Make Subpage]]

Latest revision as of 19:45, 19 October 2020

Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.

Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.

Major Events

These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.

What When Where Link Status
Hartford Marathon Yearly
2nd Sat in Oct
Hartford
E/W Hartford
Closures 2014 - In Progress
(pumrum)

Minor Events

These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.

What When Where Link Status
Riverwalk Yearly
July 4th Wknd
Hartford
E Hartford
Closures 2014 - Submitted
(pumrum)
Manchester Road Race Yearly
Thanksgiving Day
Manchester [1] 2014 - Submitted
(pumrum)
First Night Hartford Yearly
New Years Eve
Hartford Event Site 2014 - Not Yet Submitted

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open
Shuttle Meadow Rd
b/w Flanders & Ledge
Approx
4/15/20XX
(USER)
Approx
11/15/20XX
(USER)
ROAD CLOSED
Seasonal Closure per
Southington PD

Danbury

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Old Newtown Rd Approx
9/8/20
(Jallen)
Approx
11/6/20
(Jallen)
ROAD CLOSED
Intersection and safety improvements
BOTG Pics

DOT Info

Putnam

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Modock Rd Approx
10/18/20
(Jallen)
Approx
12/21/20
(Jallen)
ROAD CLOSED
Air Trail Construciton
<LINK>
River Rd Approx
10/16/20
(harrypotter418)
Approx
12/31/20
(harrypotter418)
ROAD CLOSED
Excavation & installation of tunnel
Trails Committe Info

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Station Rd Approx
10/5/20
(Jallen)
Approx
12/21/20
(Jallen)
ROAD CLOSED
Bridge Replacement
Const Journal

Redding FB

Waterbury

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Exit 19 Off-Ramp (I-84 Westbound to Route 8 Southbound) Approx
10/18/20
(Jallen)
Approx
10/24/20
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT
Bank Street On-Ramp (I-84 Westbound to Route 8 Southbound) Approx
10/18/20
(Jallen)
Approx
10/24/20
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT
Exit 33 Ramp (SR-8 NB to I-84 WB) Approx
9/25/20
(Jallen)
Approx
1/3/21
(Jallen)
ROAD CLOSED
Mixmaster construction
DOT

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME> Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>