New York/To do/Main: Difference between revisions Discussion View history

(note about editing To Do)
m (*/To_do/Main*/fixed link)
Line 10: Line 10:
* Remove excess geometry nodes (those which are '''not''' changing the geometry of a segment). When the geometry node is very near the end of a segmsegment double check while zoomed-in to see if the geometry node is actually changing the turn angle.
* Remove excess geometry nodes (those which are '''not''' changing the geometry of a segment). When the geometry node is very near the end of a segmsegment double check while zoomed-in to see if the geometry node is actually changing the turn angle.
* Inspect and correct connectivity of necessary junctions.
* Inspect and correct connectivity of necessary junctions.
* Update the road network "Street Types" to match FC, for more information see [[#Major Roads|FC update info]]
* Update the road network "Street Types" to match FC, for more information see [[#FC Upgrade|FC update info]]
* Update all segment "Street Names" in accordance with the guidelines in the [[Road_names/USA|Road Names (USA)]] wiki article.
* Update all segment "Street Names" in accordance with the guidelines in the [[Road_names/USA|Road Names (USA)]] wiki article.
* Inspect and correct overpasses/underpasses to ensure that the segments are on different levels, and do not have a junction node where they meet.
* Inspect and correct overpasses/underpasses to ensure that the segments are on different levels, and do not have a junction node where they meet.

Revision as of 18:02, 13 August 2014


If you have any additions, updates, corrections, or suggestions for this page, feel free to edit it yourself, or send a PM to one of the RCs or SMs listed below.

Thank you, and Happy Wazing!


Primary issues for maintaining the road network

  • Remove unneeded junction nodes (those not at intersections, or separating segments with different properties, i.e. city-name, street name, elevation, allowed U-turns, or splitting a segment which is over 10km long).
  • Remove excess geometry nodes (those which are not changing the geometry of a segment). When the geometry node is very near the end of a segmsegment double check while zoomed-in to see if the geometry node is actually changing the turn angle.
  • Inspect and correct connectivity of necessary junctions.
  • Update the road network "Street Types" to match FC, for more information see FC update info
  • Update all segment "Street Names" in accordance with the guidelines in the Road Names (USA) wiki article.
  • Inspect and correct overpasses/underpasses to ensure that the segments are on different levels, and do not have a junction node where they meet.
  • Ensure that any roads crossing at the same elevation level have a junction node connecting them.

See New York/To do for guidance in New York that may not be universal to all other states and territories, and for special project lists.