Oregon/To do: Difference between revisions Discussion View history

No edit summary
Line 173: Line 173:


|}
|}




Line 182: Line 183:
!width="15%"|Est Compl Date
!width="15%"|Est Compl Date
!width="60%"|Links and comments
!width="60%"|Links and comments
|-
|US210 (Scholls Ferry Rd) and River Rd intersection
|December 2011
|Washington County is rebuilding the intersection of Scholls Ferry Rd (OR210) and River Rd as a roundabout.
[http://www.co.washington.or.us/LUT/TransportationProjects/scholls-ferry-river-road-intersection.cfm?page=About County Project About Page]
[https://www.waze.com/cartouche/?zoom=6&lat=45.42305&lon=-122.91723 WazeMap]
|-
|-
|I-5 at Del Rio Rd
|I-5 at Del Rio Rd
Line 188: Line 196:
[http://www.oregon.gov/ODOT/HWY/REGION3/delrio.shtml ODOT Project Page]
[http://www.oregon.gov/ODOT/HWY/REGION3/delrio.shtml ODOT Project Page]


[https://www.waze.com/cartouche/?zoom=4&lon=-123.3595&lat=43.29159&layers=BTFTTTTFTFTFTTTTT&segments=62910090 WazeMap]
[https://www.waze.com/cartouche/?zoom=4&lon=-123.3595&lat=43.29159&segments=62910090 WazeMap]
|-
|-
|US199 at Josephine Co fairgrounds
|US199 at Josephine Co fairgrounds
Line 195: Line 203:
[http://www.oregon.gov/ODOT/HWY/REGION3/fairgrounds.shtml ODOT Project Page]
[http://www.oregon.gov/ODOT/HWY/REGION3/fairgrounds.shtml ODOT Project Page]


[https://www.waze.com/cartouche/?zoom=6&lon=-123.34127&lat=42.42291&layers=BTFTTTTFTFTFTTTTT&segments=40382799,61607495 WazeMap]
[https://www.waze.com/cartouche/?zoom=6&lon=-123.34127&lat=42.42291&segments=40382799,61607495 WazeMap]
|}
|}


== Useful Resources ==
== Useful Resources ==

Revision as of 19:32, 3 November 2011

This page is intended to inform map editors on what is being worked on or is completed in the State of Oregon, as well as what is planned according to ODOT or other cities as we find out about them. The last section has transportation and highway resource links for the state.

As of creation of this page, there are two primary active area managers that either have all or a majority of Oregon in their editing permissions. If you have any questions, or need guidance, please feel free to contact them.

Please remember to follow all standards of editing, documented in this wiki. By marking a project complete, you are stating that the work was done following the standard set down by the community (or as best as possible in case where scenarios don't fit any of the standards documented).

Area Managers

AM Contact Notes
User:Rallychris Forum PM
Alan Email or PM State-wide AM for WA, OR, ID

Interstate

Name Editor(s) Status Comments
I-5 AlanOfTheBerg,

RallyChris

99% complete Full length from Washington to California border is intact and should be routable. There may be some exceptions to properly named exits.
File:I-82.png I-82 AlanOfTheBerg
I-84 AlanOfTheBerg 99% complete Full length from Portland to the Idaho border is intact and should be routable. There may be some exceptions to properly named exits.
File:I-82.png I-82 AlanOfTheBerg,

RallyChris

File:I-105.png I-105 AlanOfTheBerg
File:I-205.png I-205 AlanOfTheBerg,

RallyChris

File:I-405.png I-405 AlanOfTheBerg


State Highway

Name Editor(s) Status Comments
File:OR-35.png SR-35 RallyChris Complete
File:OR-260.png SR-260 RallyChris Complete


Road Closures

This section contains details about road closures currently in place in Waze, usually through disconnecting of segments to prevent Waze from routing along a certain stretch of road. If you perform a closure in Waze, please document it here so other area managers can ensure the roads are reconnected at the appropriate time.

Road Name Editor Closed Date Est Open Date Links and comments


Future New or Realigned Roads

Large road construction projects often have website project pages and give notice to the public prior to starting. If we stage these roads in Waze and have them ready to deploy when they open to the public, Waze will be a leader in update map providers.

Road Or Project Name Est Compl Date Links and comments
US210 (Scholls Ferry Rd) and River Rd intersection December 2011 Washington County is rebuilding the intersection of Scholls Ferry Rd (OR210) and River Rd as a roundabout.

County Project About Page

WazeMap

I-5 at Del Rio Rd Sep 2012 ODOT will replace the Del Rio bridge over I-5 at the Winchester Interchange (Exit 129). All ramps for Exit 129 will move and Del Rio Rd and OR99 will be realigned.

ODOT Project Page

WazeMap

US199 at Josephine Co fairgrounds Summer 2012 ODOT to redesign the intersections of US199 and Fairgrounds and Ringuette.

ODOT Project Page

WazeMap