I- 44 to I- 270: Complete. | I- 44 to I- 270: Complete. | ||
Outside I- 255: done to Arnold. Needs locking and some exit renaming | Outside I- 255: done to Arnold. Needs locking and some exit renaming | ||
|- align="center" | |- align="center" | ||
|I- 64 || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed. | |I- 64 || MisterAsterix || 04/19/10 || Assigned || {|PSB to Kingshighway: Completed.| | ||
Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date. | Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.| | ||
I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. | I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.| | ||
I- 270 to MO River: Most exits & overpasses complete. Needs locking. | I- 270 to MO River: Most exits & overpasses complete. Needs locking.| | ||
MO River to I- 70: Some exits & overpasses complete. Needs locking. | MO River to I- 70: Some exits & overpasses complete. Needs locking.|} | ||
|- align="center" | |- align="center" | ||
|I- 70 || MisterAsterix || 04/19/10 || Assigned || All overpasses done from the river to I- 270. Some exits need naming. Needs Locking. | |I- 70 || MisterAsterix || 04/19/10 || Assigned || All overpasses done from the river to I- 270. Some exits need naming. Needs Locking. | ||
Line 37: | Line 38: | ||
{| border="1" cellpadding="2" | {| border="1" cellpadding="2" | ||
|- align="center" | |- align="center" | ||
|width="100pt" | |width="100pt" style="background:blue; color:white"|Illinois Interstate Name | ||
|width="100pt" | |width="100pt" style="background:blue; color:white"|Responsible Area Manager | ||
|width="100pt" | |width="100pt" style="background:blue; color:white"|Date Started | ||
|width="100pt" | |width="100pt" style="background:blue; color:white"|Status | ||
|width="300pt" | |width="300pt" style="background:blue; color:white"|Comment | ||
|- align="center" | |- align="center" | ||
|I- 55/70 || MisterAsterix || 04/19/10 || Completed || Completed | |I- 55/70 || MisterAsterix || 04/19/10 || Completed || Completed |
Revision as of 19:21, 21 April 2010
Missouri Interstate Name | Responsible Area Manager | Date Started | Status | Comment |
I- 44 | MisterAsterix | 04/19/10 | Assigned | Overpasses and exits done from I- 55 to I- 270. some done outside I -270. |
I- 55 | MisterAsterix | 04/19/10 | Assigned | PSB to I- 44: Complete.
I- 44 to I- 270: Complete. Outside I- 255: done to Arnold. Needs locking and some exit renaming |
I- 64 | MisterAsterix | 04/19/10 | Assigned | PSB to Kingshighway: Completed.|
Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.| I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.| I- 270 to MO River: Most exits & overpasses complete. Needs locking.| MO River to I- 70: Some exits & overpasses complete. Needs locking.|} |
I- 70 | MisterAsterix | 04/19/10 | Assigned | All overpasses done from the river to I- 270. Some exits need naming. Needs Locking. |
I- 170 | MisterAsterix | 04/19/10 | Completed | Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.) |
I- 255 | MisterAsterix | 04/19/10 | Completed | Complete. |
I- 270 | MisterAsterix | 04/19/10 | Assigned | The river to I- 170: Complete.
I- 170 to I- 70: Complete. I- 70 to I- 64: Complete. I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking. I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking. |
Illinois Interstate Name | Responsible Area Manager | Date Started | Status | Comment |
I- 55/70 | MisterAsterix | 04/19/10 | Completed | Completed |
I- 55 | TBD | 04/19/10 | Assigned | ... |
I- 64 | MisterAsterix | 04/19/10 | Assigned | Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches. |
I- 70 | MisterAsterix | 04/19/10 | Assigned | Just started |
I- 255 | MisterAsterix | 04/19/10 | Assigned | Overpasses complete. Exits 90% Complete. Locking has started |
I- 270 | MisterAsterix | 04/19/10 | Assigned | Overpasses complete. Some Exits need naming. Locking has started near river. |
US Highway Name | Responsible Area Manager | Date Started | Status | Comment |
US- 40 in IL | TBD | 04/19/10 | Unassigned | ... |
US- 61 | TBD | 04/19/10 | Unassigned | ... |
US- 67 | TBD | 04/19/10 | Unassigned | ... |
US- 367 | TBD | 04/19/10 | Unassigned | ... |
MO Highway Name | Responsible Area Manager | Date Started | Status | Comment |
MO- 94 | MisterAsterix | 04/19/10 | Assigned | ... |
MO- 364 | MisterAsterix | 04/19/10 | Assigned | Exits and overpasses 90% complete to MO- 94. Needs locking. |
MO- 370 | MisterAsterix | 04/19/10 | Assigned | Exits and Overpasses named and complete. Needs locking. |
IL Highway Name | Responsible Area Manager | Date Started | Status | Comment |
IL- 255 | MisterAsterix | 04/19/10 | Assigned | Road laid. Exits done from I- 255 to Wood River exit. Needs locking. |
Major Intersection | Responsible Area Manager | Date Started | Status | Comment |
Poplar Street Bridge (I- 55/64/70) | MisterAsterix | 00/00/10 | Complete | Complete though some experimenting going on to make driving instructions clearer. |