To Do - St. Louis, MO: Difference between revisions Discussion View history

No edit summary
No edit summary
Line 74: Line 74:
|[[Image:I-70.png|35px| | |I- 70]]|| TBD || 04/19/10 || Unassigned || ...   
|[[Image:I-70.png|35px| | |I- 70]]|| TBD || 04/19/10 || Unassigned || ...   
|- align="center"
|- align="center"
|[[Image:I-255.png|42px| | |I- 255]]|| MisterAsterix || 04/19/10 || Assigned || JB Bridge to [[Image:I-64.png|20px| | |I- 64]]: Overpasses complete. Exits 90% Complete. Locking has started near [[Image:I-64.png|20px| | |I- 64]].
|[[Image:I-255.png|42px| | |I- 255]]|| MisterAsterix || 04/19/10 || Assigned || JB Bridge to [[Image:I-64.png|20px| | |I- 64]]: [[Image:I-64.png|20px| | |I- 64]] to Exit 13: Complete.


[[Image:I-64.png|20px| | |I- 64]] to [[Image:I-55.png|20px| | |I- 55]][[Image:I-70.png|20px| | |I- 70]]: Complete.
[[Image:I-64.png|20px| | |I- 64]] to [[Image:I-55.png|20px| | |I- 55]][[Image:I-70.png|20px| | |I- 70]]: Complete.

Revision as of 22:42, 28 April 2010

Missouri Freeway Area Manager Date Started Status Comment
I- 44 MisterAsterix 04/19/10 Assigned I- 55 to I- 270: Exits Overpasses ~75% done.

Outside I- 270: Started.

I- 55 MisterAsterix 04/19/10 Assigned PSB to I- 44: Complete.

I- 44 to I- 255I- 270: Complete.

Outside I- 255I- 270: done to Arnold. Needs locking and some exit renaming

I- 64US Hwy- 40 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.

I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.

I- 270 to MO River: Most exits & overpasses complete. Needs locking.

MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to I- 170: Complete.

I- 170 to I- 270: Complete.

I- 270 to MO River: Complete.

MO River to MO- 370: Complete.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete.

I- 70 to I- 64: Complete.

I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking.

I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.

MO- 364 (aka Page Ave Extension) MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


Illinois Freeway Responsible Area Manager Date Started Status Comment
I- 55I- 70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Unassigned ...
I- 64 MisterAsterix 04/19/10 Assigned From I- 55I- 70 Split to I- 255: Complete.

I- 255 to I- 57: Complete from I- 255 to Exit 14

I- 70 TBD 04/19/10 Unassigned ...
I- 255 MisterAsterix 04/19/10 Assigned JB Bridge to I- 64: I- 64 to Exit 13: Complete.

I- 64 to I- 55I- 70: Complete.

I- 55I- 70 to I- 270: Complete.

IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.
I- 270 MisterAsterix 04/19/10 Completed The River to I- 255IL- 255: Complete.

I- 255IL- 255 to I- 55I- 70: Complete.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 TBD 04/19/10 Assigned ...


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned See Illinois Freeways


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 04/19/10 Complete Complete though some experimenting going on to make driving instructions clearer.