Translations:Turkey/119/en View history

Revision as of 18:34, 6 July 2017 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Allow at least two weeks before closing. In addition, before you close the report, try to figure out what the problem was. Always improve the area before you close the UR. Use the "Closing an UR after no feedback" text from the