Translations:Venezuela/MMR 2015/43/en-gb View history

(Created page with "300px|right|borderFor cases that the '''path separated into two (a segment for each direction, as shown in MapRaidPUE#Trazo_de_v.C3.ADas_de_doble_...")
 
No edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[File:UturnDobleSeg.png|300px|right|border]]For cases that the '''path separated into two (a segment for each direction, as shown in [[MapRaidPUE#Trazo_de_v.C3.ADas_de_doble_sentido|the diagram of the previous section]]), the U-Turns must be segments connecting both ways, and it should measure '''16 meters''' or more.
[[File: UturnOK.png | 300px | right | border]] The segments are in reality '''divided''' by a curbstone '''but''' in Waze use a single segment (as shown in the [[MapRaidPUE # Trazo_de_v.C3.ADas_de_doble_sentido | diagram of the previous section]]) U-turns should be activated at each intersection where it is not specifically prohibited.
{{clear}}
{{clear}}

Latest revision as of 20:06, 19 November 2015

The segments are in reality divided by a curbstone but in Waze use a single segment (as shown in the diagram of the previous section) U-turns should be activated at each intersection where it is not specifically prohibited.