New Housing Development/en: verschil tussen versies Geschiedenis weergeven

Geen bewerkingssamenvatting
(Bijgewerkt vanwege een nieuwe basisversie van de bronpagina)
Regel 1: Regel 1:
{{TopLine}}
{{TopLine}}
<languages />
<languages />
<div class="mw-translate-fuzzy">
==New Housing Development==
==New Housing Development==
* Roads in a new developed neighborhood can be mapped when they are drivable. They may be still [[Road Aspects|unpaved]]. Don't map new roads that are only in the planning stage.  
* Roads in a new developed neighborhood can be mapped when they are drivable. They may be still [[Road Aspects|unpaved]]. Don't map new roads that are only in the planning stage.  
Regel 9: Regel 10:
{{Clear}}
{{Clear}}
[[File:Wijk-in-aanbouw.png|400px]]
[[File:Wijk-in-aanbouw.png|400px]]
</div>
   
   
__NOTOC__
__NOTOC__
{{Bottomline}}
{{Bottomline}}

Versie van 17 okt 2021 22:10

Andere talen:

New Housing Development

  • Roads in a new developed neighborhood can be mapped when they are drivable. They may be still unpaved. Don't map new roads that are only in the planning stage.
  • As long as the new roads and houses are being developed, routing through should be prevented. Better choose for the 4x4 roadtype to prevent navigation through, the checking of the unpaved attribute may not be enough.
  • While the construction is going on several times changes will have to be applied: perhaps closures set, road type or attributes changed. Map comments can be used to document these fases.




Main Page | Index