Connecticut/To do: Difference between revisions Discussion View history

No edit summary
No edit summary
Line 19: Line 19:
| rowspan="2" | I- 291 || freeducky || 12/11/10 || Completed || Edited to dual carriageway, added all missing ramps.
| rowspan="2" | I- 291 || freeducky || 12/11/10 || Completed || Edited to dual carriageway, added all missing ramps.
|- align="center"
|- align="center"
| AndyPoms || 2/6/2012 || Completed || Edited Exits 1 to 3 for proper numbering & destinations.  Freeway portion extended to I-84 (with tiny ramp) for proper guidance.
| AndyPoms || 2/6/2012 || In Progress || Edited Exits 1 to 3 for proper numbering & destinations.  Freeway portion extended from I-84 W (with tiny ramp) for proper guidance.  Can't extend freeway portion to I-84 E due to locked segment.
|}
|}



Revision as of 01:02, 7 February 2012

Editing info can be found here. Sounds scary but it's [easy] Just watch this short video.


Freeway Name Responsible Area Manager Date Started Status Comment
I- 91 Unknown 2/6/2012 Found Completed Needs HOV lanes added north of Hartford
I- 84 Unknown 2/6/2012 Found Completed Needs HOV lanes added east of Manchester
I- 384 TBD 12/11/10 Unassigned Manchester/E Hartford: Marked as freeway, removed bad overpass/underpass connections, ramps need fixing. Needs work east of Manchester.
I- 291 freeducky 12/11/10 Completed Edited to dual carriageway, added all missing ramps.
AndyPoms 2/6/2012 In Progress Edited Exits 1 to 3 for proper numbering & destinations. Freeway portion extended from I-84 W (with tiny ramp) for proper guidance. Can't extend freeway portion to I-84 E due to locked segment.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 5 TBD 12/11/10 Unassigned John Fitch Blvd needs dual carriageway north of I- 291 fixed.
AndyPoms 2/5/2012 Completed Ellington Rd south of I- 291 needs dual carriageway fixed.


CT Highway Name Responsible Area Manager Date Started Status Comment
CT- 2 TBD 12/11/10 Unassigned Needs editing east of E Hartford, needs to be marked as major highway.
AndyPoms 2/6/2012 Partially Completed Did as much as I could E of Hartford. Several locked segments (level 6) could not be changed. Only got just past RT 11 because "banished" (level 4) has the rest locked and labeled as freeway. "banished" also has several major errors further down (intersection of CT 2 & I-395 has ramps not connected and locked)
CT- 9 TBD 12/11/10 Unassigned Needs editing south of I- 91, needs to be marked as major highway.


Major Intersection Responsible Area Manager Date Started Status Comment
I- 91 / CT- 9 TBD 12/11/10 Unassigned Needs interchange editing completed.