No edit summary |
(I- 70 complete between I- 170 and I- 270) |
||
Line 23: | Line 23: | ||
|[[Image:30px-I-70.png]] I- 70 || MisterAsterix || 04/19/10 || Assigned || PSB to I- 170: Complete. | |[[Image:30px-I-70.png]] I- 70 || MisterAsterix || 04/19/10 || Assigned || PSB to I- 170: Complete. | ||
I- 170 to I- 270: | I- 170 to I- 270: Complete. | ||
I- 270 to MO River: Most exits done. Needs locking. | I- 270 to MO River: Most exits done. Needs locking. |
Revision as of 19:34, 22 April 2010
US Highway Name | Responsible Area Manager | Date Started | Status | Comment |
US- 40 in IL | TBD | 04/19/10 | Unassigned | ... |
US- 61 | TBD | 04/19/10 | Unassigned | ... |
US- 67 | TBD | 04/19/10 | Unassigned | ... |
US- 367 | TBD | 04/19/10 | Unassigned | ... |
MO Highway Name | Responsible Area Manager | Date Started | Status | Comment |
MO- 94 | MisterAsterix | 04/19/10 | Assigned | ... |
MO- 364 | MisterAsterix | 04/19/10 | Assigned | Exits and overpasses 90% complete to MO- 94. Needs locking. |
MO- 370 | MisterAsterix | 04/19/10 | Assigned | Exits and Overpasses named and complete. Needs locking. |
IL Highway Name | Responsible Area Manager | Date Started | Status | Comment |
IL- 255 | MisterAsterix | 04/19/10 | Assigned | Road laid. Exits done from I- 255 to Wood River exit. Needs locking. |
Major Intersection | Responsible Area Manager | Date Started | Status | Comment |
Poplar Street Bridge (I- 55/64/70) | MisterAsterix | 00/00/10 | Complete | Complete though some experimenting going on to make driving instructions clearer. |