To Do - St. Louis, MO: Difference between revisions Discussion View history

(I- 70 complete between I- 170 and I- 270)
(Added images and formatting)
Line 7: Line 7:
|width="300pt" style="background:blue; color:white"|Comment
|width="300pt" style="background:blue; color:white"|Comment
|- align="center"
|- align="center"
|I- 44|| MisterAsterix || 04/19/10 || Assigned || Overpasses and exits done from I- 55 to I- 270. some done outside I -270.
|[[Image:I-44_(MO).png|30px]] I- 44|| MisterAsterix || 04/19/10 || Assigned || [[Image:I-55_(MO).png|20px]] to [[Image:I-270_(MO).png|25px]]: Exits Overpasses ~75% done.
 
Outside [[Image:I-270_(MO).png|25px]]: Started.
|- align="center"
|- align="center"
|[[Image:30px-I-55.png]] I- 55 || MisterAsterix || 04/19/10 || Assigned || PSB to I- 44: Complete.
|[[Image:I-55_(MO).png|30px]] I- 55 || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-44_(MO).png|20px]]: Complete.


I- 44 to I- 270: Complete.
[[Image:I-44_(MO).png|20px]] to [[Image:I-255_(MO).png|25px]][[Image:I-270_(MO).png|25px]]: Complete.


Outside I- 255: done to Arnold. Needs locking and some exit renaming
Outside [[Image:I-255_(MO).png|25px]][[Image:I-270_(MO).png|25px]]: done to Arnold. Needs locking and some exit renaming
|- align="center"
|- align="center"
|[[Image:30px-I-64.png]] I- 64 || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  
|[[Image:I-64_(MO).png|30px]] I- 64 || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  
Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.
 
I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
Kingshighway to [[Image:I-170_(MO).png|25px]]: Complete but left unlocked until Sat images are up to date.
I- 270 to MO River: Most exits & overpasses complete. Needs locking.
 
MO River to I- 70: Some exits & overpasses complete. Needs locking.
[[Image:I-170_(MO).png|25px]] to [[Image:I-270_(MO).png|25px]]: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
 
[[Image:I-270_(MO).png|25px]] to MO River: Most exits & overpasses complete. Needs locking.
MO River to [[Image:I-70_(MO).png|20px]]: Some exits & overpasses complete. Needs locking.
|- align="center"
|- align="center"
|[[Image:30px-I-70.png]] I- 70 || MisterAsterix || 04/19/10 || Assigned || PSB to I- 170: Complete.
|[[Image:I-70_(MO).png|30px]] I- 70 || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-170_(MO).png|25px]]: Complete.


I- 170 to I- 270: Complete.
[[Image:I-170_(MO).png|25px]] to [[Image:I-270_(MO).png|25px]]: Complete.


I- 270 to MO River: Most exits done. Needs locking.
[[Image:I-270_(MO).png|25px]] to MO River: Most exits done. Needs locking.


MO River to MO- 370: Some exits done.
MO River to MO- 370: Some exits done.
Line 31: Line 36:
MO- 370 to US Hwy- 40: Sporadic.
MO- 370 to US Hwy- 40: Sporadic.
|- align="center"
|- align="center"
|I- 170 || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
|[[Image:I-170_(MO).png|36px]] I- 170 || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
|- align="center"
|- align="center"
|I- 255 || MisterAsterix || 04/19/10 || Completed || Complete.
|[[Image:I-255_(MO).png|36px]] I- 255 || MisterAsterix || 04/19/10 || Completed || Complete.
|- align="center"
|- align="center"
|I- 270 || MisterAsterix || 04/19/10 || Assigned || The river to I- 170: Complete.  
|[[Image:I-270_(MO).png|36px]] I- 270 || MisterAsterix || 04/19/10 || Assigned || The river to [[Image:I-170_(MO).png|25px]]: Complete.  
I- 170 to I- 70: Complete.  
[[Image:I-170_(MO).png|25px]] to [[Image:I-70_(MO).png|20px]]: Complete.  
I- 70 to I- 64: Complete.
[[Image:I-70_(MO).png|20px]] to [[Image:I-64_(MO).png|20px]]: Complete.
I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking.
[[Image:I-64_(MO).png|20px]] to [[Image:I-44_(MO).png|20px]]: Most overpasses done. Some exits named. Needs Locking.
I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.
[[Image:I-44_(MO).png|20px]] to [[Image:I-55_(MO).png|20px]]: Most overpasses done. Some exits named. Needs Locking.


|}
|}

Revision as of 20:35, 22 April 2010

Missouri Interstate Name Responsible Area Manager Date Started Status Comment
I- 44 MisterAsterix 04/19/10 Assigned to : Exits Overpasses ~75% done.

Outside : Started.

I- 55 MisterAsterix 04/19/10 Assigned PSB to : Complete.

to : Complete.

Outside : done to Arnold. Needs locking and some exit renaming

I- 64 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to : Complete but left unlocked until Sat images are up to date.

to : Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.

to MO River: Most exits & overpasses complete. Needs locking. MO River to : Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to : Complete.

to : Complete.

to MO River: Most exits done. Needs locking.

MO River to MO- 370: Some exits done.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to : Complete.

to : Complete. to : Complete. to : Most overpasses done. Some exits named. Needs Locking. to : Most overpasses done. Some exits named. Needs Locking.


Illinois Interstate Name Responsible Area Manager Date Started Status Comment
I- 55/70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Assigned ...
I- 64 MisterAsterix 04/19/10 Assigned Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches.
I- 70 MisterAsterix 04/19/10 Assigned Just started
I- 255 MisterAsterix 04/19/10 Assigned Overpasses complete. Exits 90% Complete. Locking has started
I- 270 MisterAsterix 04/19/10 Assigned Overpasses complete. Some Exits need naming. Locking has started near river.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 in IL TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 MisterAsterix 04/19/10 Assigned ...
MO- 364 MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 00/00/10 Complete Complete though some experimenting going on to make driving instructions clearer.