To Do - St. Louis, MO: Difference between revisions Discussion View history

No edit summary
No edit summary
Line 1: Line 1:
{| border="1" cellpadding="2"
{| border="1" cellpadding="2"
|- align="center"
|- align="center"
|width="100pt" style="background:blue; color:white"|Missouri Freeway
|width="80pt" style="background:blue; color:white"|Missouri Freeway
|width="100pt" style="background:blue; color:white"|Segment
|width="100pt" style="background:blue; color:white"|Area Manager
|width="100pt" style="background:blue; color:white"|Area Manager
|width="100pt" style="background:blue; color:white"|Date Started
|width="80pt" style="background:blue; color:white"|Date Started
|width="100pt" style="background:blue; color:white"|Status
|width="80pt" style="background:blue; color:white"|Status
|width="300pt" style="background:blue; color:white"|Comment
|width="300pt" style="background:blue; color:white"|Comment
|- align="center"
|- align="center"
|[[Image:I-44_(MO).png|35px| | |I- 44]] || MisterAsterix || 04/19/10 || Assigned || [[Image:I-55_(MO).png|20px| | |I- 55]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Exits Overpasses ~75% done.
|rowspan="2"|[[Image:I-44_(MO).png|35px| | |I- 44]]  
 
| [[Image:I-55_(MO).png|20px| | |I- 55]] to [[Image:I-270_(MO).png|25px| | |I- 270]]  
Outside [[Image:I-270_(MO).png|25px| | |I- 270]]: Started.
| MisterAsterix
| 04/19/10
| Assigned
| Exits Overpasses ~75% done.
|- align="center"
|Outside [[Image:I-270_(MO).png|25px| | |I- 270]]: Started.
|- align="center"
|- align="center"
|[[Image:I-55_(MO).png|35px| | |I- 55]] || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-44_(MO).png|20px| | |I- 44]]: Complete.


[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]: Complete.


Outside [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]: done to Arnold. Needs locking and some exit renaming
|rowspan="3"|[[Image:I-55_(MO).png|35px| | |I- 55]]
| PSB to [[Image:I-44_(MO).png|20px| | |I- 44]]
| MisterAsterix
| 04/19/10
| Complete
| ...
|- align="center"
|[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]
| MisterAsterix
| 04/19/10
| Complete
| ...
|- align="center"
| Outside [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]
| MisterAsterix
| 04/19/10
| In Progress
| Done to Arnold. Needs locking and some exit renaming
|- align="center"
|- align="center"
|[[Image:I-64_(MO).png|35px| | |I- 64]][[Image:US_40.png|35px| | |US Hwy- 40]] || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  
|[[Image:I-64_(MO).png|35px| | |I- 64]][[Image:US_40.png|35px| | |US Hwy- 40]] ||  || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  


Kingshighway to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete but left unlocked until Sat images are up to date.
Kingshighway to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete but left unlocked until Sat images are up to date.
Line 27: Line 48:
MO River to [[Image:I-70_(MO).png|20px| | |I- 70]]: Some exits & overpasses complete. Needs locking.
MO River to [[Image:I-70_(MO).png|20px| | |I- 70]]: Some exits & overpasses complete. Needs locking.
|- align="center"
|- align="center"
|[[Image:I-70_(MO).png|35px| | |I- 70]]|| MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.
|[[Image:I-70_(MO).png|35px| | |I- 70]]||  || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.


[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Complete.
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Complete.
Line 37: Line 58:
[[Image:MO-370.png|25px| | |MO- 370]] to [[Image:US_40.png|20px| | |US Hwy- 40]]: Sporadic.
[[Image:MO-370.png|25px| | |MO- 370]] to [[Image:US_40.png|20px| | |US Hwy- 40]]: Sporadic.
|- align="center"
|- align="center"
|[[Image:I-170_(MO).png|42px| | |I- 170]] || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near [[Image:I-64_(MO).png|20px| | |I- 64]] until Sat images are up to date.)
|[[Image:I-170_(MO).png|42px| | |I- 170]] ||  || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near [[Image:I-64_(MO).png|20px| | |I- 64]] until Sat images are up to date.)
|- align="center"
|- align="center"
|[[Image:I-255_(MO).png|42px| | |I- 255]] || MisterAsterix || 04/19/10 || Completed || Complete.
|[[Image:I-255_(MO).png|42px| | |I- 255]] ||  || MisterAsterix || 04/19/10 || Completed || Complete.
|- align="center"
|- align="center"
|[[Image:I-270_(MO).png|42px| | |I- 270]] || MisterAsterix || 04/19/10 || Assigned || The river to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.  
|[[Image:I-270_(MO).png|42px| | |I- 270]] ||  || MisterAsterix || 04/19/10 || Assigned || The river to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.  
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-70_(MO).png|20px| | |I- 70]]: Complete.
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-70_(MO).png|20px| | |I- 70]]: Complete.


Line 50: Line 71:
[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-55_(MO).png|20px| | |I- 55]]: Most overpasses done. Some exits named. Needs Locking.
[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-55_(MO).png|20px| | |I- 55]]: Most overpasses done. Some exits named. Needs Locking.
|- align="center"
|- align="center"
|[[Image:MO-364.png|42px| | |MO- 364]] (aka Page Ave Extension)  || MisterAsterix || 04/19/10 || Assigned || Exits and overpasses 90% complete to MO- 94. Needs locking.
 
 
|[[Image:MO-364.png|42px| | |MO- 364]] (aka Page Ave Extension) || || MisterAsterix || 04/19/10 || Assigned || Exits and overpasses 90% complete to MO- 94. Needs locking.
|- align="center"
|- align="center"
|[[Image:MO-370.png|42px| | |MO- 370]] || MisterAsterix || 04/19/10 || Assigned || Exits and Overpasses named and complete. Needs locking.
|[[Image:MO-370.png|42px| | |MO- 370]] || MisterAsterix || 04/19/10 || Assigned || Exits and Overpasses named and complete. Needs locking.

Revision as of 12:48, 30 April 2010

Missouri Freeway Segment Area Manager Date Started Status Comment
I- 44 I- 55 to I- 270 MisterAsterix 04/19/10 Assigned Exits Overpasses ~75% done.
Outside I- 270: Started.
I- 55 PSB to I- 44 MisterAsterix 04/19/10 Complete ...
I- 44 to I- 255I- 270 MisterAsterix 04/19/10 Complete ...
Outside I- 255I- 270 MisterAsterix 04/19/10 In Progress Done to Arnold. Needs locking and some exit renaming
I- 64US Hwy- 40 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.

I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.

I- 270 to MO River: Most exits & overpasses complete. Needs locking.

MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to I- 170: Complete.

I- 170 to I- 270: Complete.

I- 270 to MO River: Complete.

MO River to MO- 370: Complete.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete.

I- 70 to I- 64: Complete.

I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking.

I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.

MO- 364 (aka Page Ave Extension) MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


Illinois Freeway Responsible Area Manager Date Started Status Comment
I- 55I- 70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Unassigned ...
I- 64 MisterAsterix 04/19/10 Assigned From I- 55I- 70 Split to I- 255: Complete.

I- 255 to I- 57: Complete from I- 255 to Exit 14

I- 70 TBD 04/19/10 Unassigned ...
I- 255 MisterAsterix 04/19/10 Completed JB Bridge to I- 64: Complete.

I- 64 to I- 55I- 70: Complete.

I- 55I- 70 to I- 270: Complete.

IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.
I- 270 MisterAsterix 04/19/10 Completed The River to I- 255IL- 255: Complete.

I- 255IL- 255 to I- 55I- 70: Complete.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 TBD 04/19/10 Assigned ...


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned See Illinois Freeways


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 04/19/10 Complete Complete though some experimenting going on to make driving instructions clearer.