To Do - St. Louis, MO: Difference between revisions Discussion View history

No edit summary
No edit summary
Line 11: Line 11:
|I- 55 || MisterAsterix || 04/19/10 || Assigned || Exits and intersections done from River to Arnold. Needs locking and some exit renaming
|I- 55 || MisterAsterix || 04/19/10 || Assigned || Exits and intersections done from River to Arnold. Needs locking and some exit renaming
|- align="center"
|- align="center"
|I- 64 || MisterAsterix || 04/19/10 || Assigned || All of the exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. Older stretch from from the river to Kingshighway is named but parts need locking  
|I- 64 || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: named but parts need locking.
Kingshighway to I- 170: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
I- 270 to MO River: Most exits & overpasses complete. Needs locking.
MO River to I- 70: Some exits & overpasses complete. Needs locking.
|- align="center"
|- align="center"
|I- 70 || MisterAsterix || 04/19/10 || Assigned || All overpasses done from the river to I- 270. Some exits need naming.   
|I- 70 || MisterAsterix || 04/19/10 || Assigned || All overpasses done from the river to I- 270. Some exits need naming.  Needs Locking.
|- align="center"
|- align="center"
|I- 170 || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
|I- 170 || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)

Revision as of 21:49, 20 April 2010

Missouri Interstate Name Responsible Area Manager Date Started Status Comment
I- 44 MisterAsterix 04/19/10 Assigned Overpasses and exits done from I- 55 to I- 270. some done outside I -270.
I- 55 MisterAsterix 04/19/10 Assigned Exits and intersections done from River to Arnold. Needs locking and some exit renaming
I- 64 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: named but parts need locking.

Kingshighway to I- 170: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers. I- 270 to MO River: Most exits & overpasses complete. Needs locking. MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned All overpasses done from the river to I- 270. Some exits need naming. Needs Locking.
I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete. I- 70 to I- 64: Complete. I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking. I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.


Illinois Interstate Name Responsible Area Manager Date Started Status Comment
I- 55/70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Assigned ...
I- 64 MisterAsterix 04/19/10 Assigned Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches.
I- 70 MisterAsterix 04/19/10 Assigned Just started
I- 255 MisterAsterix 04/19/10 Assigned Overpasses complete. Exits 90% Complete. Locking has started
I- 270 MisterAsterix 04/19/10 Assigned Overpasses complete. Some Exits need naming. Locking has started near river.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 in IL TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 MisterAsterix 04/19/10 Assigned ...
MO- 364 MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 00/00/10 Complete Complete though some experimenting going on to make driving instructions clearer.