|width="100pt" style="background:blue; color:white"|Missouri Interstate Name
|width="100pt" style="background:blue; color:white"|Missouri Interstate
|width="100pt" style="background:blue; color:white"|Responsible Area Manager
|width="100pt" style="background:blue; color:white"|Area Manager
|width="100pt" style="background:blue; color:white"|Date Started
|width="100pt" style="background:blue; color:white"|Date Started
|width="100pt" style="background:blue; color:white"|Status
|width="100pt" style="background:blue; color:white"|Status
|width="300pt" style="background:blue; color:white"|Comment
|width="300pt" style="background:blue; color:white"|Comment
|- align="center"
|- align="center"
|[[Image:I-44_(MO).png|30px]] I- 44|| MisterAsterix || 04/19/10 || Assigned || [[Image:I-55_(MO).png|20px]] to [[Image:I-270_(MO).png|25px]]: Exits Overpasses ~75% done.
|[[Image:I-44_(MO).png|50px| | |I- 44]] || MisterAsterix || 04/19/10 || Assigned || [[Image:I-55_(MO).png|20px| | |I- 55]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Exits Overpasses ~75% done.


Outside [[Image:I-270_(MO).png|25px]]: Started.
Outside [[Image:I-270_(MO).png|25px| | |I- 270]]: Started.
|- align="center"
|- align="center"
|[[Image:I-55_(MO).png|30px]] I- 55 || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-44_(MO).png|20px]]: Complete.
|[[Image:I-55_(MO).png|50px| | |I- 55]] || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-44_(MO).png|20px| | |I- 44]]: Complete.


[[Image:I-44_(MO).png|20px]] to [[Image:I-255_(MO).png|25px]][[Image:I-270_(MO).png|25px]]: Complete.
[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]: Complete.


Outside [[Image:I-255_(MO).png|25px]][[Image:I-270_(MO).png|25px]]: done to Arnold. Needs locking and some exit renaming
Outside [[Image:I-255_(MO).png|25px| | |I- 255]][[Image:I-270_(MO).png|25px| | |I- 270]]: done to Arnold. Needs locking and some exit renaming
|- align="center"
|- align="center"
|[[Image:I-64_(MO).png|30px]] I- 64 || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  
|[[Image:I-64_(MO).png|50px| | |I- 64]][[Image:US_40.png|50px| | |US Hwy- 40]] || MisterAsterix || 04/19/10 || Assigned || PSB to Kingshighway: Completed.  


Kingshighway to [[Image:I-170_(MO).png|25px]]: Complete but left unlocked until Sat images are up to date.
Kingshighway to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete but left unlocked until Sat images are up to date.


[[Image:I-170_(MO).png|25px]] to [[Image:I-270_(MO).png|25px]]: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.


[[Image:I-270_(MO).png|25px]] to MO River: Most exits & overpasses complete. Needs locking.
[[Image:I-270_(MO).png|25px| | |I- 270]] to MO River: Most exits & overpasses complete. Needs locking.
MO River to [[Image:I-70_(MO).png|20px]]: Some exits & overpasses complete. Needs locking.
 
MO River to [[Image:I-70_(MO).png|20px| | |I- 70]]: Some exits & overpasses complete. Needs locking.
|- align="center"
|- align="center"
|[[Image:I-70_(MO).png|30px]] I- 70 || MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-170_(MO).png|25px]]: Complete.
|[[Image:I-70_(MO).png|50px| | |I- 70]]|| MisterAsterix || 04/19/10 || Assigned || PSB to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.


[[Image:I-170_(MO).png|25px]] to [[Image:I-270_(MO).png|25px]]: Complete.
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-270_(MO).png|25px| | |I- 270]]: Complete.


[[Image:I-270_(MO).png|25px]] to MO River: Complete.
[[Image:I-270_(MO).png|25px| | |I- 270]] to MO River: Complete.


MO River to MO- 370: Some exits done.
MO River to [[Image:MO-370.png|25px| | |MO- 370]]: Some exits done.


MO- 370 to US Hwy- 40: Sporadic.
[[Image:MO-370.png|25px| | |MO- 370]] to [[Image:US_40.png|20px| | |US Hwy- 40]]: Sporadic.
|- align="center"
|- align="center"
|[[Image:I-170_(MO).png|36px]] I- 170 || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
|[[Image:I-170_(MO).png|65px| | |I- 170]] || MisterAsterix || 04/19/10 || Completed || Complete. (Small stretch left unlocked near [[Image:I-64_(MO).png|20px| | |I- 64]] until Sat images are up to date.)
|- align="center"
|- align="center"
|[[Image:I-255_(MO).png|36px]] I- 255 || MisterAsterix || 04/19/10 || Completed || Complete.
|[[Image:I-255_(MO).png|65px| | |I- 255]] || MisterAsterix || 04/19/10 || Completed || Complete.
|- align="center"
|- align="center"
|[[Image:I-270_(MO).png|36px]] I- 270 || MisterAsterix || 04/19/10 || Assigned || The river to [[Image:I-170_(MO).png|25px]]: Complete.  
|[[Image:I-270_(MO).png|65px| | |I- 270]] || MisterAsterix || 04/19/10 || Assigned || The river to [[Image:I-170_(MO).png|25px| | |I- 170]]: Complete.  
[[Image:I-170_(MO).png|25px]] to [[Image:I-70_(MO).png|20px]]: Complete.  
[[Image:I-170_(MO).png|25px| | |I- 170]] to [[Image:I-70_(MO).png|20px| | |I- 70]]: Complete.
[[Image:I-70_(MO).png|20px]] to [[Image:I-64_(MO).png|20px]]: Complete.
 
[[Image:I-64_(MO).png|20px]] to [[Image:I-44_(MO).png|20px]]: Most overpasses done. Some exits named. Needs Locking.
[[Image:I-70_(MO).png|20px| | |I- 70]] to [[Image:I-64_(MO).png|20px| | |I- 64]]: Complete.
[[Image:I-44_(MO).png|20px]] to [[Image:I-55_(MO).png|20px]]: Most overpasses done. Some exits named. Needs Locking.
 
[[Image:I-64_(MO).png|20px| | |I- 64]] to [[Image:I-44_(MO).png|20px| | |I- 44]]: Most overpasses done. Some exits named. Needs Locking.
 
[[Image:I-44_(MO).png|20px| | |I- 44]] to [[Image:I-55_(MO).png|20px| | |I- 55]]: Most overpasses done. Some exits named. Needs Locking.


|}
|}
Line 102: Line 106:
|MO- 364 || MisterAsterix || 04/19/10 || Assigned || Exits and overpasses 90% complete to MO- 94. Needs locking.
|MO- 364 || MisterAsterix || 04/19/10 || Assigned || Exits and overpasses 90% complete to MO- 94. Needs locking.
|- align="center"
|- align="center"
|MO- 370 || MisterAsterix || 04/19/10 || Assigned || Exits and Overpasses named and complete. Needs locking.
|[[Image:MO-370.png|36px]] MO- 370 || MisterAsterix || 04/19/10 || Assigned || Exits and Overpasses named and complete. Needs locking.
|}
|}



Revision as of 13:33, 23 April 2010

Missouri Interstate Area Manager Date Started Status Comment
I- 44 MisterAsterix 04/19/10 Assigned I- 55 to I- 270: Exits Overpasses ~75% done.

Outside I- 270: Started.

I- 55 MisterAsterix 04/19/10 Assigned PSB to I- 44: Complete.

I- 44 to I- 255I- 270: Complete.

Outside I- 255I- 270: done to Arnold. Needs locking and some exit renaming

I- 64US Hwy- 40 MisterAsterix 04/19/10 Assigned PSB to Kingshighway: Completed.

Kingshighway to I- 170: Complete but left unlocked until Sat images are up to date.

I- 170 to I- 270: Exits on 'New I-64' have been configured to match MoDOT's online plans but most of the new exits need names and numbers.

I- 270 to MO River: Most exits & overpasses complete. Needs locking.

MO River to I- 70: Some exits & overpasses complete. Needs locking.

I- 70 MisterAsterix 04/19/10 Assigned PSB to I- 170: Complete.

I- 170 to I- 270: Complete.

I- 270 to MO River: Complete.

MO River to MO- 370: Some exits done.

MO- 370 to US Hwy- 40: Sporadic.

I- 170 MisterAsterix 04/19/10 Completed Complete. (Small stretch left unlocked near I- 64 until Sat images are up to date.)
I- 255 MisterAsterix 04/19/10 Completed Complete.
I- 270 MisterAsterix 04/19/10 Assigned The river to I- 170: Complete.

I- 170 to I- 70: Complete.

I- 70 to I- 64: Complete.

I- 64 to I- 44: Most overpasses done. Some exits named. Needs Locking.

I- 44 to I- 55: Most overpasses done. Some exits named. Needs Locking.


Illinois Interstate Name Responsible Area Manager Date Started Status Comment
I- 55/70 MisterAsterix 04/19/10 Completed Completed
I- 55 TBD 04/19/10 Assigned ...
I- 64 MisterAsterix 04/19/10 Assigned Started from split from I-55/70 out to O'Fallon exit. Needs locking in stretches.
I- 70 MisterAsterix 04/19/10 Assigned Just started
I- 255 MisterAsterix 04/19/10 Assigned Overpasses complete. Exits 90% Complete. Locking has started
I- 270 MisterAsterix 04/19/10 Assigned Overpasses complete. Some Exits need naming. Locking has started near river.


US Highway Name Responsible Area Manager Date Started Status Comment
US- 40 in IL TBD 04/19/10 Unassigned ...
US- 61 TBD 04/19/10 Unassigned ...
US- 67 TBD 04/19/10 Unassigned ...
US- 367 TBD 04/19/10 Unassigned ...


MO Highway Name Responsible Area Manager Date Started Status Comment
MO- 94 MisterAsterix 04/19/10 Assigned ...
MO- 364 MisterAsterix 04/19/10 Assigned Exits and overpasses 90% complete to MO- 94. Needs locking.
MO- 370 MisterAsterix 04/19/10 Assigned Exits and Overpasses named and complete. Needs locking.


IL Highway Name Responsible Area Manager Date Started Status Comment
IL- 255 MisterAsterix 04/19/10 Assigned Road laid. Exits done from I- 255 to Wood River exit. Needs locking.


Major Intersection Responsible Area Manager Date Started Status Comment
Poplar Street Bridge (I- 55/64/70) MisterAsterix 00/00/10 Complete Complete though some experimenting going on to make driving instructions clearer.